Filter Search


Asia-Pacific


Location Summary Deadline
Japan Electricity Supply Contract: Complete (ac Three-phase Three-wire System, Supply Voltage 6, 000 Volts) Contracted Power: 725 Kw, Planned Power Consumption: 3, 385, 000 Kwh 2024-11-19
India Construction Of Concrete Road From Bamuner Chak Dipak Mondal House 2024-11-19
-Stabilizer-Bar-Large-Size-38-Inch-To-Emd-Part-No.40077306-Blw-Drg-No-40077306-Alt-d-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Stabilizer-Bar-Large-Size-38-Inch-To-Emd-Part-No.40077306-Blw-Drg-No-40077306-Alt-d-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Stablizer Bar Large
Stabilizer Bar Large Size 38 Inch To Emd Part No.40077306 Blw Drg No-40077306 Alt-d Or Latest [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Stabilizer-Bar-Large-Size-38-Inch-To-Emd-Part-No.40077306-Blw-Drg-No-40077306-Alt-d-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-11-19
Japan Semiconductor Parameter Analyzer Etc. 2024-11-19
Japan ?photographic Equipment Jph-324-h-c 53 Units, ?dental Treatment Equipment, Cabinet Table, Independent Type 6ea, ?digital Dental Panoramic X-ray Diagnostic Equipment, For Medical Room 12ea, ?dental Treatment Equipment 22ea, ?digital Image Processing Equipm 2024-11-19
India Survey, Design, Supply, Installation, Testing And Commissioning Of Kavach Equipments And Other Associated Works Between Ranital Link Cabin (rljc) - Palasa (psa) - Section Of Khurda Division Of East Coast Railway. 2024-11-19
Korea Republic of Saemangeum Inter-regional Connection Road Construction (section 3) 2024-11-19
-Roof-Mounted-Air-Conditioning-System-Without-Through-To-Rdso's-Specn.-No.-Rdso/2007/el/spec/0055-(rev.2)-Or-Latest.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Roof-Mounted-Air-Conditioning-System-Without-Through-To-Rdso's-Specn.-No.-Rdso/2007/el/spec/0055-(rev.2)-Or-Latest.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Roof Mounted Air Conditioning System Without Through Etc.
Roof Mounted Air Conditioning System Without Through To Rdso's Specn. No. Rdso/2007/el/spec/0055 (rev.2) Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Roof-Mounted-Air-Conditioning-System-Without-Through-To-Rdso's-Specn.-No.-Rdso/2007/el/spec/0055-(rev.2)-Or-Latest.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-11-19
Japan Purchase Of Replacement Parts For Primary Helium Purification Equipment Gas Circulators, Etc. 1 Set 2024-11-19
Japan ?camera Set 53 Sets, ?dental Treatment Equipment, Independent Cabinet Table 6 Each, ?x Ray Apparatus, Dental 12 Each, ?dental Treatment Equipment 22 Each, ?digital Image Processing Device, For Dispensary 6 Each, ?multi-item Monitor With Critical Parame... 2024-11-19
Whats app