Filter Search


Asia-Pacific


Location Summary Deadline
China Procurement Project Of Diaphragm Clamp System And Other Items For West China Precision Medicine Industry Innovation Center Co., Ltd 2025-06-18
Philippines Supply And Delivery Of Long Sleeve T-shirts For 41,944 Beneficiaries Of Tupad Program In Region Xii And In Barmm Implementation 2025-06-18
India Supply, Installation And Commissioning Of Heavy Duty Wire Rope Electrical Hoist Of 10t capacity With Electrical Trolley At C&w/bhadrachalam Road Depot. .#* Supply, Installation And Commissioning Of Heavy Duty Wire Rope Electrical Hoist Of 10t Capacity Wit 2025-06-18
India Tadalafil .#* Srphc045182-tadalafil 5 Mg Tab Unit:tab [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Ma x 8 Lacs ] ] 2025-06-18
India Welcome Maintenance And Certain Misc Repairs To Jcos Ors Md Accn At Lekhapani Under Ge Dinjan No 2 2025-06-18
India Construction Of Components Of Waste To Compost (w2c) And Material Recovery Facility (mrf) Plant Under Swachh Bharat Mission (sbm-u 2.0) With 15th Fc Tied Grant 2025-06-18
-Construction-Of-New-33/11-Kv-Switching-Sub-Station-At-Barjora-Wbidc-Industrial-Park-Under-Bankura-Division,-Dist.-Bankura>India -Construction-Of-New-33/11-Kv-Switching-Sub-Station-At-Barjora-Wbidc-Industrial-Park-Under-Bankura-Division,-Dist.-Bankura>Mz/civil/tender/25-26/05 Dated 15.05.2025
Construction Of New 33/11 Kv Switching Sub Station At Barjora Wbidc Industrial Park Under Bankura Division, Dist. Bankura
-Construction-Of-New-33/11-Kv-Switching-Sub-Station-At-Barjora-Wbidc-Industrial-Park-Under-Bankura-Division,-Dist.-Bankura>2025-06-18
-Ref>India -Ref>Construction Of Outdoor Spread Out Type Fabricated Switchyard Structure Alongwith Installation Of All Equipement Laying Of Cables Erection Of Earth Mat, Electrical Wiring Of Control Room Of Switching Substation At Wbidc Industrial Park, Barjora.
Ref
-Ref>2025-06-18
India Life Enhancement Of Crusher House, Stps. 2025-06-18
-Conducting-On-Site-Testing-And-Monitoring-Of-Different-Environmental-Parameters-And-Preparation-Of-Detailed-Reports-As-Environmental-Clearance-Compliance-Reports-(eccr)-For-Online>India -Conducting-On-Site-Testing-And-Monitoring-Of-Different-Environmental-Parameters-And-Preparation-Of-Detailed-Reports-As-Environmental-Clearance-Compliance-Reports-(eccr)-For-Online>Kmda/civil/housing/se/c-iv/05 (2nd Call) Of 2025-26 Date. 13.05.2025
Conducting On Site Testing And Monitoring Of Different Environmental Parameters And Preparation Of Detailed Reports As Environmental Clearance Compliance Reports (eccr) For Online
-Conducting-On-Site-Testing-And-Monitoring-Of-Different-Environmental-Parameters-And-Preparation-Of-Detailed-Reports-As-Environmental-Clearance-Compliance-Reports-(eccr)-For-Online>2025-06-18
Whats app