Filter Search


Asia-Pacific


Location Summary Deadline
India Supply Of Modified Traction Link Bolt Size M-20, Gr 8.8, To Clw Drg.no. 1209-01.413-024 Alt-nil [ Warranty Period: 30 Months After The Date Of Delivery ] 2024-08-26
Japan ?hospital Information System (core Systems) 1 Set,?hospital Information System (department Systems) 1 Set 2024-08-26
Japan Manufacture And Installation (including Associated Wiring, Operational Testing, Adjustments, Providing Operator Training And Disposing Existing Equipments) Of Centralized Monitor And Control System For Aeronautical Radio Navigation Aids. 2024-08-26
Japan The Educational Computer System For Students With Visual Impairments 1 Set 2024-08-26
Thailand Construction To Expand The Area - Improve The Electrical Distribution System At Wat Phan Thong work Number (wbs) C-66-h-pntcs.0381 2024-08-26
Japan A Complete Set Of Maintenance And Lease Of Personal Computers For Teleworking Relating To Renewal Of Hello Work System 2024-08-27
Japan Gas Used At The National Hospital Organization Tokyo Hospital: Medium Pressure 1,121,000m3, Low Pressure 24,900m3 2024-08-27
Thailand Hire A Contractor To Expand The Area For The Pa Dong Klo Monks~ Residence. (wat Pa Dong Khlo Yansampanno) 198 Village No. 6, Wang Kwang Subdistrict, Nam Nao District, Phetchabun Province, By Specific Method. 2024-08-27
Japan Implementing A Test And Accepting Applications, Etc. For The Qualification Examination For Consumer Affair Consultants, 2025-2027, 1 Set 2024-08-27
India Construction Of Semi Underground Reservoir Cum Booster Pumping Station At Jiban Ratan Dhar Smriti Uddyan Alongwith Five Years Operation And Maintenance In Ward No. 100. 2024-08-27
Whats app