Filter Search


Asia-Pacific


Location Summary Deadline
-Supply-Of-Pvc-Insulated-Armoured,-Unscreened,-Underground-Railway-Signalling-Cable-As-Per-Rdso-Spec.-No.-Irs:-63/2014-Rev.-4.0-Size-19cx1.5-Mm-Sq.-[-Warranty-Period:-30-Months-After-The-Date-Of-Deli>India -Supply-Of-Pvc-Insulated-Armoured,-Unscreened,-Underground-Railway-Signalling-Cable-As-Per-Rdso-Spec.-No.-Irs:-63/2014-Rev.-4.0-Size-19cx1.5-Mm-Sq.-[-Warranty-Period:-30-Months-After-The-Date-Of-Deli>Supply Of Signalling Cable 19 Core X 1.5 Sqmm Etc.
Supply Of Pvc Insulated Armoured, Unscreened, Underground Railway Signalling Cable As Per Rdso Spec. No. Irs:-63/2014 Rev. 4.0 Size 19cx1.5 Mm Sq. [ Warranty Period: 30 Months After The Date Of Deli
-Supply-Of-Pvc-Insulated-Armoured,-Unscreened,-Underground-Railway-Signalling-Cable-As-Per-Rdso-Spec.-No.-Irs:-63/2014-Rev.-4.0-Size-19cx1.5-Mm-Sq.-[-Warranty-Period:-30-Months-After-The-Date-Of-Deli>2024-10-21
-Deployment-Of-3-(three)-Nos.-Security-Guard-Without-Arm-For-Guarding-Arrangement-Of-Office-Cum-Store-At-Chanditala-Water-Supply-Scheme-Under-Serampore-Sub-division,-Under-Hooghly-Division,-Phe-Dte.-Period-12-Months-From>India -Deployment-Of-3-(three)-Nos.-Security-Guard-Without-Arm-For-Guarding-Arrangement-Of-Office-Cum-Store-At-Chanditala-Water-Supply-Scheme-Under-Serampore-Sub-division,-Under-Hooghly-Division,-Phe-Dte.-Period-12-Months-From>Wbphe/ee/10/hug/2024-25,sl-7
Deployment Of 3 (three) Nos. Security Guard Without Arm For Guarding Arrangement Of Office Cum Store At Chanditala Water Supply Scheme Under Serampore Sub-division, Under Hooghly Division, Phe Dte. Period 12 Months From
-Deployment-Of-3-(three)-Nos.-Security-Guard-Without-Arm-For-Guarding-Arrangement-Of-Office-Cum-Store-At-Chanditala-Water-Supply-Scheme-Under-Serampore-Sub-division,-Under-Hooghly-Division,-Phe-Dte.-Period-12-Months-From>2024-10-21
-Battery-For-Air-Conditioning-2-Volt-1100-Ah-Vrla-For-Ac-Coaches-Conforming-To-Rdso-Specn.no.-Rdso/pe/spec/ac/0009-2014-(rev.2)-Complete-With-Intercell,-Inter-Unit-And-End-Cell-Connectors-&-Fasten>India -Battery-For-Air-Conditioning-2-Volt-1100-Ah-Vrla-For-Ac-Coaches-Conforming-To-Rdso-Specn.no.-Rdso/pe/spec/ac/0009-2014-(rev.2)-Complete-With-Intercell,-Inter-Unit-And-End-Cell-Connectors-&-Fasten>Supply Of Battery For Air Conditioning 2 Volt 1100 Ah
Battery For Air Conditioning 2 Volt 1100 Ah Vrla For Ac Coaches Conforming To Rdso Specn.no. Rdso/pe/spec/ac/0009-2014 (rev.2) Complete With Intercell, Inter Unit And End Cell Connectors & Fasten
-Battery-For-Air-Conditioning-2-Volt-1100-Ah-Vrla-For-Ac-Coaches-Conforming-To-Rdso-Specn.no.-Rdso/pe/spec/ac/0009-2014-(rev.2)-Complete-With-Intercell,-Inter-Unit-And-End-Cell-Connectors-&-Fasten>2024-10-21
-Drone-Camera-(thermal)-With-Essential-Accessories-And-Laptop,-Make:-Boom/mavic:-Ideaforge/kam,-(laptop-Of-Intel-Core-I5-Processor-16gb-Ddr4-3200-Ram-512-Gb-Ssdd-Hard-Drive-2gb-Graphic-Card-Laptop-Make:-Dell/asus/hp-[-Warranty>India -Drone-Camera-(thermal)-With-Essential-Accessories-And-Laptop,-Make:-Boom/mavic:-Ideaforge/kam,-(laptop-Of-Intel-Core-I5-Processor-16gb-Ddr4-3200-Ram-512-Gb-Ssdd-Hard-Drive-2gb-Graphic-Card-Laptop-Make:-Dell/asus/hp-[-Warranty>Supply Of Drone Camera
Drone Camera (thermal) With Essential Accessories And Laptop, Make: Boom/mavic: Ideaforge/kam, (laptop Of Intel Core I5 Processor 16gb Ddr4-3200 Ram 512 Gb Ssdd Hard Drive 2gb Graphic Card Laptop Make: Dell/asus/hp [ Warranty
-Drone-Camera-(thermal)-With-Essential-Accessories-And-Laptop,-Make:-Boom/mavic:-Ideaforge/kam,-(laptop-Of-Intel-Core-I5-Processor-16gb-Ddr4-3200-Ram-512-Gb-Ssdd-Hard-Drive-2gb-Graphic-Card-Laptop-Make:-Dell/asus/hp-[-Warranty>2024-10-21
-Building-Work>India -Building-Work>Construction Of Watch Tower And Watchmen Shed At Kanjhari Irrigation Project Under Drip-ii
Building Work
-Building-Work>2024-10-21
Korea Republic of 2025 Incheon Nonhyeon Middle School Uniform (winter, Summer) School-sponsored Purchase Bidding Notice 2024-10-21
India Construction Of Strr Nh 948a Somakkanamutta (magadi Taluk) To Kunigal (ramanagara Taluk) From Km46.300 To Km 79.000 In Karnataka On Ham Project Length 32.70 Phasei Pkg2 2024-10-21
India Petty Repairing Work Of Electrical General Service At B.r. Singh Hospital, Sealdah For One (01) Year. 2024-10-21
-Chandrakona-Ghatal-Road-Sh-4---Short-Term-Measures-For-Black-Spot-At-27th-Km-Mansatala-Chatal-Under-Midnapur-Division,-P.w.d.-In-The-District-Of-Paschim-Medinipur-During-The-Year-2024-2025.>India -Chandrakona-Ghatal-Road-Sh-4---Short-Term-Measures-For-Black-Spot-At-27th-Km-Mansatala-Chatal-Under-Midnapur-Division,-P.w.d.-In-The-District-Of-Paschim-Medinipur-During-The-Year-2024-2025.>Wbpwd/9(6)/ee/mid Div/24-25, Sl.6
Chandrakona Ghatal Road Sh-4 - Short Term Measures For Black Spot At 27th Km Mansatala Chatal Under Midnapur Division, P.w.d. In The District Of Paschim Medinipur During The Year 2024-2025.
-Chandrakona-Ghatal-Road-Sh-4---Short-Term-Measures-For-Black-Spot-At-27th-Km-Mansatala-Chatal-Under-Midnapur-Division,-P.w.d.-In-The-District-Of-Paschim-Medinipur-During-The-Year-2024-2025.>2024-10-21
India Job Work Of Motorization Of Metal Gates Of Cnp I Plant Along With Supply Installation And Commissioning 2024-10-21
Whats app