Filter Search


Asia-Pacific


Location Summary Deadline
China Announcement Of The 2024 Pepper Seed Procurement Project (package 6) In Linze County, Zhangye City 2024-10-22
-Repair-Renovation-Of-Jhama-And-Bituminous-Road-In-S.n.b-Road-Bayam-Samity-Club-To-Sibaji-Sangha>India -Repair-Renovation-Of-Jhama-And-Bituminous-Road-In-S.n.b-Road-Bayam-Samity-Club-To-Sibaji-Sangha>Pm/pwd/nit-5/2024-25 Sl-14
Repair Renovation Of Jhama And Bituminous Road In S.n.b Road Bayam Samity Club To Sibaji Sangha
-Repair-Renovation-Of-Jhama-And-Bituminous-Road-In-S.n.b-Road-Bayam-Samity-Club-To-Sibaji-Sangha>2024-10-22
India Construction Of 220kv Khetri-chirawa-hisar Line - 120 Kms. Under Bn-9019002403 2024-10-22
India Proposed Cess Repair Widening Work For Making Up Of Cess In Aden/ath & Mpl Sub-divisions Under Den/wes Jurisdiction. 2024-10-22
India Construction Of Underground Water Storage Tank To Facilitate The Municipality Water Supply For Drinking Purpose Of Residents Of Colony Area At Katwa 132 Kv Substation. 2024-10-22
-Supply-&-Installation-Of-Rolling-Stock-Test-Rig.-(as-Per-Attached-Specifications)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Supply-&-Installation-Of-Rolling-Stock-Test-Rig.-(as-Per-Attached-Specifications)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Supply & Installation Of Rolling Stock Test Rig.
Supply & Installation Of Rolling Stock Test Rig. (as Per Attached Specifications) [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Supply-&-Installation-Of-Rolling-Stock-Test-Rig.-(as-Per-Attached-Specifications)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-10-22
qty:1
>India
qty:1
>Supply Of Library Management Software (q2)
qty:1
qty:1
>2024-10-22
India Supply Of Hyd. Valve Plasser Part No. Hy24rsh-b/a Rexroth Part No. H4weh25h4x/eg24n9etk4 Make Plasser Or Rexroth (lt S.no-173) [ Warranty Period: 6 Months After The Date Of Delivery ] ] 2024-10-22
India Auction Sale Of Property[32227] / Mix Use Plot No. 14/oc/s/105 (corner) Ring Road Project Vill-sitarampura, 2024-10-22
-Replacement-Of-Cr-Seal-Required-For-Expansion-Joints-Over-Maa-Flyover>India -Replacement-Of-Cr-Seal-Required-For-Expansion-Joints-Over-Maa-Flyover>08/se/c-i/rb/kmda/ W-03 (part-i) Of 2024-2025 (2nd Call) Date-18/09/2024
Replacement Of Cr Seal Required For Expansion Joints Over Maa Flyover
-Replacement-Of-Cr-Seal-Required-For-Expansion-Joints-Over-Maa-Flyover>2024-10-22
Whats app