Filter Search


Asia-Pacific


Location Summary Deadline
India Sale Of Immovable Properties, House. 2024-10-25
India Replacement & Renovation Of The Internal Electrical Installation Works Incl. Submain Wiring Of 04 Nos. Flat (flat No. Flat No. C11 3, C 7 3, C12 3, C 7 5 At Milanpally Rhe, Under Electrical Sub Division No Iii Hd 2024-10-25
India Construction Of Yard Foundation, Cable Trench, Metal Spreading, Rcc Road, Demolition & Construction Of Store Building And Staking Platform Etc. Civil Work & Scrap Recovery For Availing Power Supply At 66kv Vadali Tss By Western Railway At 220kv Bhutiya Ss 2024-10-25
-Crank-Arrangement-For-Passenger-Communication-Gear-As-Per-Drg.-No.-emu-3-5-298-Drg-Attached.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Crank-Arrangement-For-Passenger-Communication-Gear-As-Per-Drg.-No.-emu-3-5-298-Drg-Attached.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Procurement Of Crank Arrangement For Passenger Communication Gear As Per Drg. No.etc.
Crank Arrangement For Passenger Communication Gear As Per Drg. No.-emu-3-5-298 Drg Attached. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Crank-Arrangement-For-Passenger-Communication-Gear-As-Per-Drg.-No.-emu-3-5-298-Drg-Attached.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-10-25
India Ohe Modification Work In Connection With Proposed Arme & Art Siding At Nandurbar Yard In Virar-surat Section Of Mumbai Division 2024-10-25
Mongolia Systems And Equipment For Personal Interest Declarations And Assets And Income Declarations 2024-10-25
India Repairing Of Ph-ii And Construction Of Sanitary Arrangement Under Augmentation Of Kamgachi Zone-ii Under Ranaghat Sub-division Under Nadia Division Phe Dte. 2024-10-25
-Construction-Of-Boundary-Wall-At-Existing-Pump-House-(two-Nos)for-Kawa-Khali-W/s-Scheme-Under-Siliguri-Water-Supply-Division-Phe-Dte.(considering-A-Length-Of-70-Metre)>India -Construction-Of-Boundary-Wall-At-Existing-Pump-House-(two-Nos)for-Kawa-Khali-W/s-Scheme-Under-Siliguri-Water-Supply-Division-Phe-Dte.(considering-A-Length-Of-70-Metre)>Phe/swsd/ee/niet- 16 Of 2024-25 (sl No 03)
Construction Of Boundary Wall At Existing Pump House (two Nos)for Kawa Khali W/s Scheme Under Siliguri Water Supply Division Phe Dte.(considering A Length Of 70 Metre)
-Construction-Of-Boundary-Wall-At-Existing-Pump-House-(two-Nos)for-Kawa-Khali-W/s-Scheme-Under-Siliguri-Water-Supply-Division-Phe-Dte.(considering-A-Length-Of-70-Metre)>2024-10-25
Japan Operating Lights, Surgical Field Cameras, And Operating Room Video Management System 1 Set 2024-10-25
India Supply Of Charges For 80km Perday X 20 Days For Hilly Terrain, Charges For 10 Night Halts Including Accommodation Food Other Charges For Driver, Extra Charges Per Each Km Travel, Fuel Charges, Maintenance Charges During The Trip 2024-10-25
Whats app