Filter Search


Asia-Pacific


Location Summary Deadline
India Secondary Vertical Damper For Lhb Ac Coaches. .#* Secondary Vertical Damper For Lhb Ac Coaches Having Fiat Bogie To Rdsodrg. No. Rdso/ cg/drg/21046, Alt. 2, Conforming To Rdso Specification No. Rdso/cg-18005, Rev. 01. [ Warranty Period: 72 Months After Th 2025-09-15
-Consultancy-Services-For-Preparation-Of-Dpr>India -Consultancy-Services-For-Preparation-Of-Dpr>Consultancy Services For Preparation Of Dpr For Widening And Strengthening Upto 7m Or 10m Or 4 Lane From Km 18.10 To Km 127.740 Except Km 71.2 To 77.6 And 97.6 To Km 104.92 And 108.2 To Km 117.16 Of Nh 64
Consultancy Services For Preparation Of Dpr
-Consultancy-Services-For-Preparation-Of-Dpr>2025-09-15
India Auction Sale Of Flat No 204 Total Built Up Area 963 Sq Feet*#. All That Part And Parcel Of The Property Bearing Second Floor Flat No A 204 Total Built Up Area 963 Sq Feet Approx Lakeview Residency Under Construction Property On Land Admeasuring 36 197 Sq 2025-09-15
India M.s. Snap Head Rivet Size 20 X 112 Mm. .#* M.s. Snap Head Rivet Size 20 X 112 Mm. Specification : - To Is:1929:1982,(reaffirmed 2 021,incorporating 04 Amendments),first Revision, Steel To Is:1148:2009 (reaffirmed 2021,incorporati ng 01 Amendment), Fourth 2025-09-15
-Development-Of-5-star-Eco-tourism-Resort-At-Long-Island,-Ani-On-Ppp-Basis-For-A-Concession-Period-Of-75-Years>India -Development-Of-5-star-Eco-tourism-Resort-At-Long-Island,-Ani-On-Ppp-Basis-For-A-Concession-Period-Of-75-Years>Development Of 5-star Eco-tourism Resort At Long Island, Ani
Development Of 5-star Eco-tourism Resort At Long Island, Ani On Ppp Basis For A Concession Period Of 75 Years
-Development-Of-5-star-Eco-tourism-Resort-At-Long-Island,-Ani-On-Ppp-Basis-For-A-Concession-Period-Of-75-Years>2025-09-15
Thailand Hire A Concrete Pouring Covered With 22 Kv System In Front Of The Sri Prachan Category To Wat Wang Wa Intersection, 26 Trees. 2025-09-15
India Pin For Wap-4 Loco Inner Brake Hanger As Per Clw Drawing No. 03/4/19/45 Alt-4 .#* Pin For Wap-4 Loco Inner Brake Hanger As Per Clw Drawing No. 03/4/19/45 Alt-4 [ Warra nty Period: 30 Months After The Date Of Delivery ] ] 2025-09-15
-Rfp-For-Imp>India -Rfp-For-Imp>Rfp For Improvement And Widening To Two Laning With Paved Shoulder Of National Highway 127b From Km. 0.000 To Km 31.500 In The State Of Meghalaya On Epc Basis Under Ne Road Network Connectivity Improvement Through Jica Oda Loan Phase-vii
Rfp For Imp
-Rfp-For-Imp>2025-09-15
India Magnet Valve 3223c .#* Magnet Valve 3223c To Rotexs Drg. No. 081-28-001-000-1-c Or Similar. [ Warranty Pe riod: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitt ed: Max 8 2025-09-15
-Construction-Of-Balance-Work-Of-Bi-directional-Tunnel-At-Km-83rd-And-A-Major-Bridge-Between-Km-82.675-And-Km-82.925-On-Nh-244-In-The-Ut-Of-Jk-On-Epc-Mode>India -Construction-Of-Balance-Work-Of-Bi-directional-Tunnel-At-Km-83rd-And-A-Major-Bridge-Between-Km-82.675-And-Km-82.925-On-Nh-244-In-The-Ut-Of-Jk-On-Epc-Mode>Nhidcl/jk/nh-244/epc/ Tunnelkm83/2025-26
Construction Of Balance Work Of Bi-directional Tunnel At Km 83rd And A Major Bridge Between Km 82.675 And Km 82.925 On Nh-244 In The Ut Of Jk On Epc Mode
-Construction-Of-Balance-Work-Of-Bi-directional-Tunnel-At-Km-83rd-And-A-Major-Bridge-Between-Km-82.675-And-Km-82.925-On-Nh-244-In-The-Ut-Of-Jk-On-Epc-Mode>2025-09-15
Whats app