Filter Search


Asia-Pacific


Location Summary Deadline
India Fire Retardant Decorative Thermosetting .#* Fire Retardant Decorative Thermosetting Synthetic Resin Bonded Laminated Sheets For N ac Coaches Conforming To The Requirement Stipulated In Rdso Specification No. C-k 514 (rev 1) Of Sept ember 2023 Or Latest. I 2025-12-29
India Construction Of Icbp Road From Sk. Salims House To Debkhal Via Kathgola Of Narugram Gram Panchayat Under Raina-i Development Block . 2025-12-29
-Construction-Of-Cc-Road-With-Solling-From-H/o-Najrul-Mondal-To-H/o-Babur-Ali-Mondal-At-Mouza---Pingaleswar-J.l-No.-51-L--200-Ft.-B-6-Ft.-(apas/01/099/108/0002)>India -Construction-Of-Cc-Road-With-Solling-From-H/o-Najrul-Mondal-To-H/o-Babur-Ali-Mondal-At-Mouza---Pingaleswar-J.l-No.-51-L--200-Ft.-B-6-Ft.-(apas/01/099/108/0002)>Nit No 333/bdr/apas Sl No 34
Construction Of Cc Road With Solling From H/o Najrul Mondal To H/o Babur Ali Mondal At Mouza - Pingaleswar J.l No. 51 L- 200 Ft. B-6 Ft. (apas/01/099/108/0002)
-Construction-Of-Cc-Road-With-Solling-From-H/o-Najrul-Mondal-To-H/o-Babur-Ali-Mondal-At-Mouza---Pingaleswar-J.l-No.-51-L--200-Ft.-B-6-Ft.-(apas/01/099/108/0002)>2025-12-29
-Construction-Of-Bridge-In-Golaghat-District-I)-Br.-No.-3/1-On-Road-From-2-No-Bokuli-Chapori-To-Kancha-chapori-Via-Devithan>India -Construction-Of-Bridge-In-Golaghat-District-I)-Br.-No.-3/1-On-Road-From-2-No-Bokuli-Chapori-To-Kancha-chapori-Via-Devithan>Golaghat/17 Construction Of Bridge I) Br. No. 3/1 On Road From 2 No Bokuli Chapori To Kancha-chapori Via Devithan
Construction Of Bridge In Golaghat District I) Br. No. 3/1 On Road From 2 No Bokuli Chapori To Kancha-chapori Via Devithan
-Construction-Of-Bridge-In-Golaghat-District-I)-Br.-No.-3/1-On-Road-From-2-No-Bokuli-Chapori-To-Kancha-chapori-Via-Devithan>2025-12-29
India Widening Strengthening And Maintenance Of Selected R And Bd Roads In The Wanaparthy 1 Package In Telangana Under Hybrid Annuity Mode Phase I Package 29 2025-12-29
Malaysia Maintenance Services Of Public Parks And Water Ponds At Peoples Park, Parkland Township (n46a), Klang Selatan 2025-12-29
India Procurement Of Coupler Rod For Blc Wagon Etc. .#* Coupler Rod For Blc Wagon As Per Drg.no.contr-9405-s-17 Alt-6 Or Latest ,item N o.1, Specification As Per Annexure Attached. [ Warranty Period: 30 Months After The Date Of Delive ry ] ] 2025-12-29
India Auction Sale Of Lot No - 1 Lot Name - 1976980102 Product Type - Category - 2025-12-29
India Erection Of 33/11kv Substation With Connected 33kv And 11kv Lines At Mahagaon (v) In Bhainsa Rural (m) Of Bhainsa Division Of Operation Nirmal Circle Under T And D/ Si Scheme On Partial Turnkey Basis 2025-12-29
India Renovation Of Cc Road From Jagganagar Suroj Hemrom House To Aspiyara Bibi 2025-12-29
Whats app