Filter Search


Asia-Pacific


Location Summary Deadline
Thailand Aaj-hiring Turn Key To Improve The Distribution System, Adding Circuit 185 Sac Connecting F3 From Egat Mae Rim To Egat Samoeng (ban Tung Hua Chang To Ban Pang Da) Sections 1 To 13 2024-11-06
-Distribution-Of-70-Lt.-Insulated-Box-With-Weighing-Machine-To-The-Fish-Vendors/sellers-For-Alipurduar-District-During-The-Fy-2024-25>India -Distribution-Of-70-Lt.-Insulated-Box-With-Weighing-Machine-To-The-Fish-Vendors/sellers-For-Alipurduar-District-During-The-Fy-2024-25>Wbdof/adf/apd/e-nit-03 /2024-25
Distribution Of 70 Lt. Insulated Box With Weighing Machine To The Fish Vendors/sellers For Alipurduar District During The Fy 2024-25
-Distribution-Of-70-Lt.-Insulated-Box-With-Weighing-Machine-To-The-Fish-Vendors/sellers-For-Alipurduar-District-During-The-Fy-2024-25>2024-11-06
-Emergency-Piling-Work-Along-With-Sand-Filling-For-Protecting-The-Riverbed-Tubewell-Alongwith-Collecting-Line-Against-Flash-Flood-At-Manbazar-i-W/s-Scheme-Under-Purulia-Division,-Phe-Dte.>India -Emergency-Piling-Work-Along-With-Sand-Filling-For-Protecting-The-Riverbed-Tubewell-Alongwith-Collecting-Line-Against-Flash-Flood-At-Manbazar-i-W/s-Scheme-Under-Purulia-Division,-Phe-Dte.>Wbphed/09/pd/2024-25/sl.19
Emergency Piling Work Along With Sand Filling For Protecting The Riverbed Tubewell Alongwith Collecting Line Against Flash Flood At Manbazar-i W/s Scheme Under Purulia Division, Phe Dte.
-Emergency-Piling-Work-Along-With-Sand-Filling-For-Protecting-The-Riverbed-Tubewell-Alongwith-Collecting-Line-Against-Flash-Flood-At-Manbazar-i-W/s-Scheme-Under-Purulia-Division,-Phe-Dte.>2024-11-06
Korea Republic of Detailed Design Service For Improving Safety Facilities At 37 Crossings Including The Bukpyeong Line Buksam Crossing 2024-11-06
-Led-Marker-Light-To-Drg/specn.-No.(-I)-Elrs-/spec-/pr-/-0022-(-Rev.1-,oct-2004)-Except-Page-No.-24-(ii)-Clw/es/sk-1/l-29-Alt-a.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Led-Marker-Light-To-Drg/specn.-No.(-I)-Elrs-/spec-/pr-/-0022-(-Rev.1-,oct-2004)-Except-Page-No.-24-(ii)-Clw/es/sk-1/l-29-Alt-a.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Led Marker Light
Led Marker Light To Drg/specn. No.( I) Elrs /spec /pr / 0022 ( Rev.1 ,oct 2004) Except Page No. 24 (ii) Clw/es/sk-1/l-29 Alt-a. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Led-Marker-Light-To-Drg/specn.-No.(-I)-Elrs-/spec-/pr-/-0022-(-Rev.1-,oct-2004)-Except-Page-No.-24-(ii)-Clw/es/sk-1/l-29-Alt-a.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-11-06
Japan West Tokyo International Innovation Co-creation Hub Network Construction And Management Services 2024-11-06
India Supply Of Gum Sprit Of Turpentine Oil To Is: 533/2007 In 205/210 Ltrs M.s. Barreles To Withstand In Transit And Storage Will Be Considered Provided Transit Risk Is Born By The Firm. The Date Of Supply Of The Material Should Be Within 60 Days From The Date 2024-11-06
-Rope-Wire-Steel-Ro>India -Rope-Wire-Steel-Ro>Supply Of Rope Wire Steel Round Strand 6 Mm Dia Ordinary For R.h.o. Lay 6x 19 Contruction Performed Wire Tensile Strength Designation 1770 Galvd "b" Type To Is: 1835/76 Fibre Core Breaking Load Of Wire Rope 19.6 Kn To Is: 3459/77.
Rope Wire Steel Ro
-Rope-Wire-Steel-Ro>2024-11-06
Japan Hospital Main Building Power Supply: Complete Set 2024-11-06
Japan Complete Set Of Notification Notices And Payment Slips For Income Tax, Special Income Tax For Reconstruction, Consumption Tax And Local Consumption Tax (categories 1-3) 2024-11-06
Whats app