Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Covered Drain From Bhasan Rajbanshi House Towards Chor Kalitala At Villege Madhunia,under Jasohari Anukha-ii Gram Panchayet. 2025-12-30
India Grant Of Lease For Development Of Vertical Air Space For Commercial Development Above The South Side Station Building Of Tirupati Railway Station. Vertical Air Space Development 2025-12-30
India Sale Of Property By Au Small Finance Bank Limited, Jaipur V/s. M/s. Shree Shyambaba Enterprises 2025-12-30
-Supply-Of-Micronutrients-Namely-Chelated-Zinc-And-Disodium-Octaborate-Tetrahydrtae>India -Supply-Of-Micronutrients-Namely-Chelated-Zinc-And-Disodium-Octaborate-Tetrahydrtae>Agri / Dda(admn) / N24pgs / E-nit - 25 /25-26 Dt. 25.11.25
Supply Of Micronutrients Namely Chelated Zinc And Disodium Octaborate Tetrahydrtae
-Supply-Of-Micronutrients-Namely-Chelated-Zinc-And-Disodium-Octaborate-Tetrahydrtae>2025-12-30
India Tender Invited For Epc Package For Bess Implementation At Ntpc Unchahar 2025-12-30
India Lav.side Wall Set For Lhb Coaches .#* Lav.side Wall Set For Lhb Coaches (without Primer) As Per Planning Set List No. Mp lavlhbside Version 2. [ Warranty Period: 84 Months After The Date Of Delivery ] ] 2025-12-30
India Tender For Preparation Of List Of Beneficiaries For Construction Of 500, 1000 And 5000 Mt Capacity Warehouse Projects Under Cashew Fruit Development Scheme. 2025-12-30
India Auction Sale Of Residential Property Admeasuring 10.01 Ares (12.40 Ares As Per Revenue Records)*#. All That Part And Parcel Of Residential Property Admeasuring 10.01 Ares (12.40 Ares As Per Revenue Records) Along With Office Building Having A Total Built 2025-12-30
-Purchase-Of-Advanced-Ventilator-Workstation-With-Closed-Loop-Automatic-Weaning-Protocols-And-Proportional-Assist-V>India -Purchase-Of-Advanced-Ventilator-Workstation-With-Closed-Loop-Automatic-Weaning-Protocols-And-Proportional-Assist-V>Purchase Of Advanced Ventilator Workstation With Closed Loop Automatic Weaning Protocols And Proportional Assist Ventilation - 12 Nos.
Purchase Of Advanced Ventilator Workstation With Closed Loop Automatic Weaning Protocols And Proportional Assist V
-Purchase-Of-Advanced-Ventilator-Workstation-With-Closed-Loop-Automatic-Weaning-Protocols-And-Proportional-Assist-V>2025-12-30
-Construction-Of-Mahendra-Tanaya-Bridge-At-Km-92.250-(design-Chainage-1.230-Km)-On-Nh-326a-In-The-State-Of-Odisha-On-Epc-Mode>India -Construction-Of-Mahendra-Tanaya-Bridge-At-Km-92.250-(design-Chainage-1.230-Km)-On-Nh-326a-In-The-State-Of-Odisha-On-Epc-Mode>Construction Of Mahendra Tanaya Bridge At Km 92.250 (design Chainage 1.230 Km) On Nh-326a In The State Of Odisha On Epc Mode
Construction Of Mahendra Tanaya Bridge At Km 92.250 (design Chainage 1.230 Km) On Nh-326a In The State Of Odisha On Epc Mode
-Construction-Of-Mahendra-Tanaya-Bridge-At-Km-92.250-(design-Chainage-1.230-Km)-On-Nh-326a-In-The-State-Of-Odisha-On-Epc-Mode>2025-12-30
Whats app