Filter Search


Asia-Pacific


Location Summary Deadline
Japan Fy2024: Support For The Study Of A Common Infrastructure For Managing Personnel Information Aimed At Establishing A System To Streamline And Enhance Personnel Management Operations In Each Ministry And Agency 2024-11-06
-Widening-&-Strengthening-Of-Navagam-bhad-erda-nerana-Road-Km-0/00-To-21/300-(from-3.75-To-5.50-Mt).>India -Widening-&-Strengthening-Of-Navagam-bhad-erda-nerana-Road-Km-0/00-To-21/300-(from-3.75-To-5.50-Mt).>Strengthening Of Kutiyana-mahiyari-bagsara Road Km 0/00 (providing Cement Concrete Road Box Culvert Head Wall Road Furniture Etc) (sh-96).
Widening & Strengthening Of Navagam-bhad-erda-nerana Road Km 0/00 To 21/300 (from 3.75 To 5.50 Mt).
-Widening-&-Strengthening-Of-Navagam-bhad-erda-nerana-Road-Km-0/00-To-21/300-(from-3.75-To-5.50-Mt).>2024-11-06
-Filter-Element-Part-No:-62.05.1000.113es-Make:-Plasser-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]-]filter-Element-Part-No:-62.05.1000.270-Make:-Plasser-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]>India -Filter-Element-Part-No:-62.05.1000.113es-Make:-Plasser-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]-]filter-Element-Part-No:-62.05.1000.270-Make:-Plasser-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]>Supply Of Filter Element
Filter Element Part No: 62.05.1000.113es Make: Plasser [ Warranty Period: 12 Months After The Date Of Delivery ] ]filter Element Part No: 62.05.1000.270 Make: Plasser [ Warranty Period: 12 Months After The Date Of Delivery ]
-Filter-Element-Part-No:-62.05.1000.113es-Make:-Plasser-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]-]filter-Element-Part-No:-62.05.1000.270-Make:-Plasser-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]>2024-11-06
-M.s.-Round-22-Mm-Conforming-To-Spec.-No.-Is-2062:2011-(reaffirmed-2021),-Grade-E250-a-In-Standard-Length.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Catego>India -M.s.-Round-22-Mm-Conforming-To-Spec.-No.-Is-2062:2011-(reaffirmed-2021),-Grade-E250-a-In-Standard-Length.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Catego>Supply Of M.s. Round 22 Mm Conforming.
M.s. Round 22 Mm Conforming To Spec. No. Is-2062:2011 (reaffirmed 2021), Grade E250-a In Standard Length. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Catego
-M.s.-Round-22-Mm-Conforming-To-Spec.-No.-Is-2062:2011-(reaffirmed-2021),-Grade-E250-a-In-Standard-Length.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Catego>2024-11-06
Korea Republic of Gunsan Industrial Waterworks Aging Pipe Improvement Project (phase 1) Facility Construction 2024-11-06
-Supplying-And-Laying-250mm-Dia-Hdpe-Pipe-(additional-Portion)-For-Distribution-Main-Pipe-Line-From-Hatuara-Ohr-Site-To-Existing-Distribution-Main-Of-Bongabari-W/s-Scheme-Under-Purulia-Sadar-Sub-division,-Of-Purulia-Divisio>India -Supplying-And-Laying-250mm-Dia-Hdpe-Pipe-(additional-Portion)-For-Distribution-Main-Pipe-Line-From-Hatuara-Ohr-Site-To-Existing-Distribution-Main-Of-Bongabari-W/s-Scheme-Under-Purulia-Sadar-Sub-division,-Of-Purulia-Divisio>Wbphed/09/pd/2024-25/sl.14
Supplying And Laying 250mm Dia Hdpe Pipe (additional Portion) For Distribution Main Pipe Line From Hatuara Ohr Site To Existing Distribution Main Of Bongabari W/s Scheme Under Purulia Sadar Sub-division, Of Purulia Divisio
-Supplying-And-Laying-250mm-Dia-Hdpe-Pipe-(additional-Portion)-For-Distribution-Main-Pipe-Line-From-Hatuara-Ohr-Site-To-Existing-Distribution-Main-Of-Bongabari-W/s-Scheme-Under-Purulia-Sadar-Sub-division,-Of-Purulia-Divisio>2024-11-06
Korea Republic of 2025 Inmate Self-purchased Items Candy Bidding 2024-11-06
-Sinking-Of-1no.-200-Mm-Dia-Dth-Rigbored-Tw-With-Allied-Works-At-Office-Campus-Under-Aug.-Of-Raghunathpur-W/s-Scheme-(zone-ib)-Within-Raghunathpur-Sub-division-Under-Purulia-Division,-Phe-Dte.>India -Sinking-Of-1no.-200-Mm-Dia-Dth-Rigbored-Tw-With-Allied-Works-At-Office-Campus-Under-Aug.-Of-Raghunathpur-W/s-Scheme-(zone-ib)-Within-Raghunathpur-Sub-division-Under-Purulia-Division,-Phe-Dte.>Wbphed/09/pd/2024-25/sl.32
Sinking Of 1no. 200 Mm Dia Dth Rigbored Tw With Allied Works At Office Campus Under Aug. Of Raghunathpur W/s Scheme (zone-ib) Within Raghunathpur Sub-division Under Purulia Division, Phe Dte.
-Sinking-Of-1no.-200-Mm-Dia-Dth-Rigbored-Tw-With-Allied-Works-At-Office-Campus-Under-Aug.-Of-Raghunathpur-W/s-Scheme-(zone-ib)-Within-Raghunathpur-Sub-division-Under-Purulia-Division,-Phe-Dte.>2024-11-06
Korea Republic of 2025 Bread Bidding For Self-purchased Items By Inmates 2024-11-06
Japan Personal Computer 269 Units And Computer Peripheral Devices 2024-11-06
Whats app