Filter Search


Asia-Pacific


Location Summary Deadline
India Sale Of Sail Rsp Industrial Gases (liquid Argon) Fa : 34004220 2024-10-31
Japan Upgrade Work Of The Network Equipment Due To The Equipment Deterioration 2024-10-31
India Supply, Installation, Commissioning & Maintenance Of Rfid Systems At Vpa- Supply Of Additional Rfid Issue/registration/renewal Permits For The Next 12 Months W.e.f., 01.11.2023. 2024-10-31
Japan Endoscope Vpp Contract 2024-10-31
-Adjusting-Piece,-Drawing--Icf-Drg.-No.-t-3-1-009,-Alt-e/3-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total>India -Adjusting-Piece,-Drawing--Icf-Drg.-No.-t-3-1-009,-Alt-e/3-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total>Supply Of Adjusting Piece, Drawing- Icf Drg. No.-t-3-1-009, Alt-e/3
Adjusting Piece, Drawing- Icf Drg. No.-t-3-1-009, Alt-e/3 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total
-Adjusting-Piece,-Drawing--Icf-Drg.-No.-t-3-1-009,-Alt-e/3-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total>2024-10-31
Japan Electricity Used At Toyota National College Of Technology: Contracted Power: 550kw; Planned Annual Power Consumption: 1, 723, 040kwh 2024-10-31
Russian Federation Control Post With Delivery To Jsc Apatit October 2024 2024-10-31
India Expression Of Interest Eoi For Empanelment Of Health Care Organizations-hcos, Hospital Diagnostic Centre, Imaging Centre, Dialysis Centre, Blood Bank Located In The Maharashtra State For Providing Super Specialty Services- Tertiary Care Only 2024-10-31
Korea Republic of Gimpo Ganghwa Area Power Supply Facility Power Line Construction (wolgot-ganghwa) 2024-10-31
Taiwan Province of China Engineering, Procurement, Construction And Commissioning Works For Intercontinental Lng Terminal Storage Tanks 2024-10-31
Whats app