Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Boundary Wall And Chain Link Mesh Fencing On Land Of Shadora Dc Under O And M Circle Ashok Nagar 2025-10-08
India Replacement Of Drinking Water Cooler In Main Campus Area, New Private Ward Area And Outer Area Etc. At Aiims, New Delhi. Replacement Of Water Cooler At Various Locations Of Outer & Masjid Moth Area At Aiims, New Delhi. Drinking Water Cooler 2025-10-08
-Work-Of-Supplying-And-Fitting-Kettle-Traps-At-Various-Places-In-Bhavnagar-And-Botad-Districts-Under-The-Jurisdiction-Of-Junagadh-Division>India -Work-Of-Supplying-And-Fitting-Kettle-Traps-At-Various-Places-In-Bhavnagar-And-Botad-Districts-Under-The-Jurisdiction-Of-Junagadh-Division>Demolishing D-04 Houses At Botad City Police Line And Leveling The Land And Transporting Goods. (third Attempt)
Work Of Supplying And Fitting Kettle Traps At Various Places In Bhavnagar And Botad Districts Under The Jurisdiction Of Junagadh Division
-Work-Of-Supplying-And-Fitting-Kettle-Traps-At-Various-Places-In-Bhavnagar-And-Botad-Districts-Under-The-Jurisdiction-Of-Junagadh-Division>2025-10-08
India Construction Of New G Plus 3 Academic Building In The Campus Of The Jnan Chandra Ghosh Polytechnic-sitc Of Lift. 2025-10-08
Philippines Provision Of Louver And Canopy At Covered Court At Brgy. Buenavista 2025-10-08
-Pg-Polyclinic,-Kolkata------Rehabilitation-Of-Distressed-Concrete-Including-Painting-Along-With-Supporting-Frame-Work-For-False-Ceiling-At-2nd-Floor-Wards,-Toilet-Etc.-During-The-Year-2025-26.>India -Pg-Polyclinic,-Kolkata------Rehabilitation-Of-Distressed-Concrete-Including-Painting-Along-With-Supporting-Frame-Work-For-False-Ceiling-At-2nd-Floor-Wards,-Toilet-Etc.-During-The-Year-2025-26.>Wbpwd/kshd/ee/nit-22 Of 2025-2026_sl.03
Pg Polyclinic, Kolkata ---- Rehabilitation Of Distressed Concrete Including Painting Along With Supporting Frame Work For False Ceiling At 2nd Floor Wards, Toilet Etc. During The Year 2025-26.
-Pg-Polyclinic,-Kolkata------Rehabilitation-Of-Distressed-Concrete-Including-Painting-Along-With-Supporting-Frame-Work-For-False-Ceiling-At-2nd-Floor-Wards,-Toilet-Etc.-During-The-Year-2025-26.>2025-10-08
India Vikas Khand Khesraha Gram Panchayat Sawadad Ke Rajaswa Gaon Pidhiya Me Prathmik Vidyalaya Se Gayya Prasad Tiwari Ke Gher Tak Cc Road Karya. 2025-10-08
India Providing And Fixing Ready Made Speed Breakers To Avoid Accidents Inside Premises Of Dspm Tps Korba East. Estimated Cost Is 196573 Including 18% Gst. The Work Completion Period Is 15 Days Including Monsoon. Ready Made Speed Breakers 2025-10-08
India Auction Sale Of Land Admeasuring 03.23 Ares And All Other Constructions*#. Item No. Ii All That Part And Parcel Of Land Admeasuring 03.23 Ares And All Other Constructions, Improvements, Easementary Rights And All Appurtenants Thereon Situated In Re-survey 2025-10-08
India Construction Of Community Shade Near Bajitpur Mallick Para Kali Mandir At Bajitpur Jl No -36 Under Amrul Gram Panchayet The Fund Apas For The Year 2025 Id (apas-01-257-108-0003) 2025-10-08
Whats app