Filter Search


Asia-Pacific


Location Summary Deadline
-Laying-Distribution-Pipe-Line-And-Providing-Functional-Household-Tap-Connection-(fhtc)-Including-Other-Allied-Work-At-Gap-Portion-Of-Tiyashi-For-Zone-iv-Of-Santuri-Block-Under-Purulia-Pipe-Water-Supply-Scheme-(northern-Sec>India -Laying-Distribution-Pipe-Line-And-Providing-Functional-Household-Tap-Connection-(fhtc)-Including-Other-Allied-Work-At-Gap-Portion-Of-Tiyashi-For-Zone-iv-Of-Santuri-Block-Under-Purulia-Pipe-Water-Supply-Scheme-(northern-Sec>Wbphed/09/pd/2024-25/sl.33
Laying Distribution Pipe Line And Providing Functional Household Tap Connection (fhtc) Including Other Allied Work At Gap Portion Of Tiyashi For Zone-iv Of Santuri Block Under Purulia Pipe Water Supply Scheme (northern Sec
-Laying-Distribution-Pipe-Line-And-Providing-Functional-Household-Tap-Connection-(fhtc)-Including-Other-Allied-Work-At-Gap-Portion-Of-Tiyashi-For-Zone-iv-Of-Santuri-Block-Under-Purulia-Pipe-Water-Supply-Scheme-(northern-Sec>2024-11-06
-3-Phase-Measuring-And-Monitoring-Relay-Rated-Voltage-Looo-V-Ac-For-Net1-Net-2-As-Per-Rdso-Specn.-No.-Rdso/pe/spec/ac/0184-2015-(rev.1)-&-Rdso-Letter-No.el/7.1.108/mssbc,dt.17/09/2021.-Make:-M/s.-Carlo-Gavazzi-Model-No.dp>India -3-Phase-Measuring-And-Monitoring-Relay-Rated-Voltage-Looo-V-Ac-For-Net1-Net-2-As-Per-Rdso-Specn.-No.-Rdso/pe/spec/ac/0184-2015-(rev.1)-&-Rdso-Letter-No.el/7.1.108/mssbc,dt.17/09/2021.-Make:-M/s.-Carlo-Gavazzi-Model-No.dp>Supply Of 3 Phase Measuring.
3 Phase Measuring And Monitoring Relay Rated Voltage Looo V Ac For Net1 Net 2 As Per Rdso Specn. No. Rdso/pe/spec/ac/0184-2015 (rev.1) & Rdso Letter No.el/7.1.108/mssbc,dt.17/09/2021. Make: M/s. Carlo Gavazzi Model No.dp
-3-Phase-Measuring-And-Monitoring-Relay-Rated-Voltage-Looo-V-Ac-For-Net1-Net-2-As-Per-Rdso-Specn.-No.-Rdso/pe/spec/ac/0184-2015-(rev.1)-&-Rdso-Letter-No.el/7.1.108/mssbc,dt.17/09/2021.-Make:-M/s.-Carlo-Gavazzi-Model-No.dp>2024-11-06
India Supply Of Ofloxacin 100 Mg + Metronidazole 200 Mg Per 5 Ml, Atleast 30 Ml Syrup ] 2024-11-06
Japan Fy2024: Support For The Study Of A Common Infrastructure For Managing Personnel Information Aimed At Establishing A System To Streamline And Enhance Personnel Management Operations In Each Ministry And Agency 2024-11-06
-Widening-&-Strengthening-Of-Navagam-bhad-erda-nerana-Road-Km-0/00-To-21/300-(from-3.75-To-5.50-Mt).>India -Widening-&-Strengthening-Of-Navagam-bhad-erda-nerana-Road-Km-0/00-To-21/300-(from-3.75-To-5.50-Mt).>Strengthening Of Kutiyana-mahiyari-bagsara Road Km 0/00 (providing Cement Concrete Road Box Culvert Head Wall Road Furniture Etc) (sh-96).
Widening & Strengthening Of Navagam-bhad-erda-nerana Road Km 0/00 To 21/300 (from 3.75 To 5.50 Mt).
-Widening-&-Strengthening-Of-Navagam-bhad-erda-nerana-Road-Km-0/00-To-21/300-(from-3.75-To-5.50-Mt).>2024-11-06
-Filter-Element-Part-No:-62.05.1000.113es-Make:-Plasser-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]-]filter-Element-Part-No:-62.05.1000.270-Make:-Plasser-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]>India -Filter-Element-Part-No:-62.05.1000.113es-Make:-Plasser-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]-]filter-Element-Part-No:-62.05.1000.270-Make:-Plasser-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]>Supply Of Filter Element
Filter Element Part No: 62.05.1000.113es Make: Plasser [ Warranty Period: 12 Months After The Date Of Delivery ] ]filter Element Part No: 62.05.1000.270 Make: Plasser [ Warranty Period: 12 Months After The Date Of Delivery ]
-Filter-Element-Part-No:-62.05.1000.113es-Make:-Plasser-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]-]filter-Element-Part-No:-62.05.1000.270-Make:-Plasser-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-]>2024-11-06
Korea Republic of Construction Management Service For The Construction Of The Shingil 12-gu Social Welfare Complex And Kindergarten 2024-11-06
India Auction For Properties/assets. 2024-11-06
-M.s.-Round-22-Mm-Conforming-To-Spec.-No.-Is-2062:2011-(reaffirmed-2021),-Grade-E250-a-In-Standard-Length.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Catego>India -M.s.-Round-22-Mm-Conforming-To-Spec.-No.-Is-2062:2011-(reaffirmed-2021),-Grade-E250-a-In-Standard-Length.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Catego>Supply Of M.s. Round 22 Mm Conforming.
M.s. Round 22 Mm Conforming To Spec. No. Is-2062:2011 (reaffirmed 2021), Grade E250-a In Standard Length. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Catego
-M.s.-Round-22-Mm-Conforming-To-Spec.-No.-Is-2062:2011-(reaffirmed-2021),-Grade-E250-a-In-Standard-Length.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Catego>2024-11-06
Korea Republic of Gunsan Industrial Waterworks Aging Pipe Improvement Project (phase 1) Facility Construction 2024-11-06
Whats app