Filter Search


Asia-Pacific


Location Summary Deadline
Australia Head Contractor - Burnside Shs – Shade Structure (with Design Responsibility) 2025-10-08
India Procurement Of Cotton Mulls Bleached White 100 Cms. Wide To Is:186-2022 .#* Cotton Mulls Bleached White 100 Cms. Wide To Is:186-2022 [ Warranty Period: 30 Mon ths After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , To 2025-10-08
India Body Poh Work Of 1050 Wagons (boxn Variant And Ss Wagons) For A Period Of One year At Wagon Repair Workshop, Badnera. 2025-10-08
India Structural Repairs To Rcc Roof, Columns, Beams, Chajjas, Parapet Walls And Other Misc Repairs Of Buildings Under Age B R-iii Of Ge Nd Visakhapatnam 2025-10-08
India Kharagpur Division - Through Sleeper Renewal(p)- 99.617 Tkm. (den/west-70.000 tkm And Den/east-29.617 Tkm) 2025-10-08
India Replacement Of Existing Fire Hydrant And Sprinklers Pipe Lines Including Modification Of Fire Alarm System At Aurangabad Airport 2025-10-08
India Painting To Lines, Dashes, Arrows And Other Pavement Painting Works To Dispersals Area, Repairs To Flexible And Rigid Pavements, Joint Filling At Afs Begumpet 2025-10-08
India 5 Star Rated Hard Top Deep Freezer .#* 5 Star Rated Hard Top Deep Freezer Of Gross Volume 500 Liters Capacity , Static Cooling Type, Consumption 0.35 Kw, Refrigeran t Type R 290a, Dimensions: 1405 X 745 X 905mm. [ Warranty Period: 30 Months After The Date 2025-10-08
India Gram Sabha Neusa Pokhare Ka Versa Jal Sanchayan Ewam Bhujal Recharge Hetu Amrit Sarover Ka Nirman Karya. 2025-10-08
India Height Raising Of 132kv Dulahipar-khalilabad Transmission Line At Railway Crossing In Khalilabad-bansi New Line Project Under Etd-i Basti 2025-10-08
Whats app