Filter Search


Asia-Pacific


Location Summary Deadline
-Balance-Work-For>India -Balance-Work-For>Balance Work For Rehabilitation And Upgradation Of Sidhi -singrauli Road From Km 82/400 To Km 187/99 (design Length 105.59 Km) Of Nh-39 (old Nh-75e) To Four Lane With Paved Shoulder In The State Of Madhya Pradesh On Item Rate Mode.
Balance Work For
-Balance-Work-For>2025-10-24
Japan Treatment Of Waste Within The Countermeasure Area (wood Chips) In Futaba-town And Namie-town, Fiscal Year 2025. Wood Chips 2025-10-24
Japan Development Of Ai Evaluation System For Autonomous Driving 1 Set 2025-10-24
Japan Automatic Cell Analysis And Sorting Device Set 2025-10-24
Japan High-dynamic Range High-speed Camera Set 2025-10-24
India Set Of Aluminium Chequered Sheet For Lhb Slr Amrit Bharat Coaches .#* Set Of Aluminium Chequered Sheet For Lhb Slr Amrit Bharat Coaches, As Per drawing: Mplacslrab Version 0, [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-10-24
Japan Japanese Version Of The Medical-specific Llm Research And Development System Foundation Set 2025-10-24
Japan Modification Of Existing Bmz-02np4 And Bms-05np4 Systems. Bmz-02np4, Bms-05np4 2025-10-24
Japan High Speed Camera With Wide Dynamic Range 1 Set 2025-10-24
India Al Moulding Ex Flat (3.18x25.4) L=1.8m .#* Al Moulding Ex Flat (3.18x25.4) L=1.8m, As Per Drawing: Cc43334, Packing Instr uction No.pi140 Ver1.0 Or Pi193 Ver1.0 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-10-24
Whats app