Filter Search


Asia-Pacific


Location Summary Deadline
India Interlocking Of 7 Nos. L-xing Gates Having Tuv More Than 20000 I.e B2-2 & C-9 On ptk-jat Section And C-46a, C-51, C-97, C-134 & C-142 On Ptkc-bprs Section Over jammu Division 2025-10-08
-Replacement-Of-2-No-S-Duct-Able-Split-Ac-Machines-And-Allied-Electrical-Work-In-Dissection-Section-Hall-At-Forensic-Building-Under-Nrsmc-And-H-Kolkata-During-The-Year-2025-26>India -Replacement-Of-2-No-S-Duct-Able-Split-Ac-Machines-And-Allied-Electrical-Work-In-Dissection-Section-Hall-At-Forensic-Building-Under-Nrsmc-And-H-Kolkata-During-The-Year-2025-26>Wbpwd/ee-ii/ckhed/ Enit-49/25-26
Replacement Of 2 No S Duct Able Split Ac Machines And Allied Electrical Work In Dissection Section Hall At Forensic Building Under Nrsmc And H Kolkata During The Year 2025 26
-Replacement-Of-2-No-S-Duct-Able-Split-Ac-Machines-And-Allied-Electrical-Work-In-Dissection-Section-Hall-At-Forensic-Building-Under-Nrsmc-And-H-Kolkata-During-The-Year-2025-26>2025-10-08
India Special Repairs To Road From M-12 To M-6 Inside Ad At Fad Under Ge Panagarh 2025-10-08
-Arm-Of-Residential-Buildings-Civil-And-Electrical-Work-For-The-Year-2025-26-At-Shq-Shimla-Tara-Devi-Camp-Shimla-H-P-Sub-Head-Civil-Painting-Work>India -Arm-Of-Residential-Buildings-Civil-And-Electrical-Work-For-The-Year-2025-26-At-Shq-Shimla-Tara-Devi-Camp-Shimla-H-P-Sub-Head-Civil-Painting-Work>Itbp/shq Sml/engr/arm Rb Civil /25-26-5993 Dtd 13-09-2025
Arm Of Residential Buildings Civil And Electrical Work For The Year 2025-26 At Shq Shimla Tara Devi Camp Shimla H P Sub Head Civil Painting Work
-Arm-Of-Residential-Buildings-Civil-And-Electrical-Work-For-The-Year-2025-26-At-Shq-Shimla-Tara-Devi-Camp-Shimla-H-P-Sub-Head-Civil-Painting-Work>2025-10-08
-Construction-Of-Bridge-In-Sonitpur-District-I)br.-No.-1/1-On-Nh15-To-Bamgaon-Connecting-Road-Package-No.ce/eap/arrbp/ocb/bridge-1/sonitpur/16>India -Construction-Of-Bridge-In-Sonitpur-District-I)br.-No.-1/1-On-Nh15-To-Bamgaon-Connecting-Road-Package-No.ce/eap/arrbp/ocb/bridge-1/sonitpur/16>Construction Of Bridge In Sonitpur District I)br. No. 1/1 On Nh15 To Bamgaon Connecting Road
Construction Of Bridge In Sonitpur District I)br. No. 1/1 On Nh15 To Bamgaon Connecting Road Package No.ce/eap/arrbp/ocb/bridge-1/sonitpur/16
-Construction-Of-Bridge-In-Sonitpur-District-I)br.-No.-1/1-On-Nh15-To-Bamgaon-Connecting-Road-Package-No.ce/eap/arrbp/ocb/bridge-1/sonitpur/16>2025-10-08
India Spl Repair To External Electrification At Tech Area Of 30 (i) R And O Flt At Partapur Under Ge 873 Ews 2025-10-08
India Reorganisation Of Primary Pathshala Pumping Water Supply Scheme Bhupatwala 2025-10-08
India Set Of Small Fabricated Items (ms) Consists Of 04 Items For Elaau/clw/dankuni .#* Set Of Small Fabricated Items (ms) Consists Of 04 Items For Elaau/clw/dankuni As Per drg.no. 1209-10.437-082 Alt 2,1209-02.441-117 & 1209-02.426-374 (set Details Attached) [ 2025-10-08
India Preventive Maintenance Contract Of 25 Kva Inverters (waves Make) Fitted In Ac coaches Of Agra Division For Twenty Four Months (02 Years). 2025-10-08
India Enhancement And Modernisation Of Ollur (olr) Goods Shed. 2025-10-08
Whats app