Filter Search


Asia-Pacific


Location Summary Deadline
Philippines Construction Of Administration Annex Building Phasde 1 (design And Build) (two Stage Buidding) 2024-11-11
Japan ?national Forester Uniform : 50men's Shirts And Other 6 Items, ?working Wear : 5 Jackets And Other 5 Items, ?shirts : 41 Work Shirts And Other 2 Items 2024-11-11
India Green Hydrogen Generation Unit Ghgu Of 10kta Capacity On Boo Basis At Indian Oil Corporation Ltd Panipat Refinery Petrochmical Complex, Panipat, Haryana, India 2024-11-11
>India >Supply Of Underground, Armoured, Unscreened, Railway Signaling Cable (heavy Duty) With High Conductivity Copper Conductor Of Size: 24 Core X 1.5 Sq Mm Conforming To Specn. No. Irs: S-63/2014 (rev.4.0) With Amendment Up To The Date Of Tender Opening.
>2024-11-11
India Rfq Cum Rfp Document For Selection Of Public Relations (pr) And Social Media Agency. 2024-11-11
-Bera-Machine-]>India -Bera-Machine-]>Supply Of Bera Machine
Bera Machine ]
-Bera-Machine-]>2024-11-11
Japan Facility-cleaning Service For 1 Set 2024-11-11
-Design,-Manufacture,-Supply,-Installation,-Testing-And-Commissioning-Of-Electric-Overhead-Traveling-Crane-Of-Capacity-25/7.5t-(refer-Clause-4-Of-Section-Iv-With-Heading--Scope-Of-Supply)-With-Comprehensive-Preventive>India -Design,-Manufacture,-Supply,-Installation,-Testing-And-Commissioning-Of-Electric-Overhead-Traveling-Crane-Of-Capacity-25/7.5t-(refer-Clause-4-Of-Section-Iv-With-Heading--Scope-Of-Supply)-With-Comprehensive-Preventive>Supply Of Eot Crane 25/7.5t Aii
Design, Manufacture, Supply, Installation, Testing And Commissioning Of Electric Overhead Traveling Crane Of Capacity 25/7.5t (refer Clause 4 Of Section Iv With Heading- Scope Of Supply) With Comprehensive Preventive
-Design,-Manufacture,-Supply,-Installation,-Testing-And-Commissioning-Of-Electric-Overhead-Traveling-Crane-Of-Capacity-25/7.5t-(refer-Clause-4-Of-Section-Iv-With-Heading--Scope-Of-Supply)-With-Comprehensive-Preventive>2024-11-11
-Rolled-Channel-75mm-X-40mm-X-4.8mm-Thk-X-5000mm-Lg-Specn:-Is:2062:2011-Gr-e-250cu-Quality-c-Killed-Normalised.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Norm>India -Rolled-Channel-75mm-X-40mm-X-4.8mm-Thk-X-5000mm-Lg-Specn:-Is:2062:2011-Gr-e-250cu-Quality-c-Killed-Normalised.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Norm>Supply Of Rolled Channel
Rolled Channel 75mm X 40mm X 4.8mm Thk X 5000mm Lg Specn: Is:2062:2011 Gr-e-250cu Quality-c Killed Normalised. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Norm
-Rolled-Channel-75mm-X-40mm-X-4.8mm-Thk-X-5000mm-Lg-Specn:-Is:2062:2011-Gr-e-250cu-Quality-c-Killed-Normalised.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Norm>2024-11-11
-Air-Supply-Isolating-Cock-For-Pantograph-With-Kaba-Key-[provided-In-The-E-70-Brake-System-Of-Wag-9-And-Wap-7-Electric-Loco].-Specification:-Clw-Drg.-No-clw/es/3/sk-3/0049.-[-Warranty-Period:-30-Mont>India -Air-Supply-Isolating-Cock-For-Pantograph-With-Kaba-Key-[provided-In-The-E-70-Brake-System-Of-Wag-9-And-Wap-7-Electric-Loco].-Specification:-Clw-Drg.-No-clw/es/3/sk-3/0049.-[-Warranty-Period:-30-Mont>Supply Of Air Supply Isolating Cock For Pantograph
Air Supply Isolating Cock For Pantograph With Kaba Key [provided In The E-70 Brake System Of Wag-9 And Wap-7 Electric Loco]. Specification: Clw Drg. No-clw/es/3/sk-3/0049. [ Warranty Period: 30 Mont
-Air-Supply-Isolating-Cock-For-Pantograph-With-Kaba-Key-[provided-In-The-E-70-Brake-System-Of-Wag-9-And-Wap-7-Electric-Loco].-Specification:-Clw-Drg.-No-clw/es/3/sk-3/0049.-[-Warranty-Period:-30-Mont>2024-11-11
Whats app