Filter Search


Asia-Pacific


Location Summary Deadline
India Tender Invited For Transformer Oil , Distribution Board 4 Way , Tape Insulation 20mm X 25 Mtr , Switch Board Pvc , Pvc Conduit , Insulating Tape , Distribution Board , Insulation Tape , Stainless Steel Wire Mesh , Decorative Curtain Rod , Curtain Rod Cp S 2025-08-11
India Vent Casing Assembly For Wash Basin Of Lhb Coaches As Per Drg. C/sk(misc)-70 .#* Vent Casing Assembly For Wash Basin Of Lhb Coaches As Per Drg. C/sk(misc)-70 [ Warra nty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , It 2025-08-11
India Addn/altn Of The Toilets And Other Connected Pateint Care Facilities At Base Hosp Under Ge East Dlehi Cantt 110010 2025-08-11
Russian Federation The Right To Conclude The Contract On 24097/530 Pacch5,6 "supply Of Drainage Pumps For The Construction Of Energy Blocks No. 5,6 Of The "pacch-ii" Nuclear Power Plant" 2025-08-11
India Nickle Cadmimum Battery .#* Nickle Cadmimum Battery Storage Unit ( 6, 150 Ah) Dlw Drg No 10609375 Alt. A a (dlw Pt.no.17051472) In Sets (one Se Consisting Of 10 Batteries) Rdso Specn No.mp.0.51.01 .02(rev.02) June- 2009 (with Amendment -1. As Per Drg.no. 2025-08-11
Russian Federation The Right To Conclude A Contract For The Supply Of Pressure Sensors And Temperature Sensors 4 Security Class For The Deactivation System Of Metal Tro Nuclear Power Plants "akkuya" 2025-08-11
India Tender Invited For Passive Night Vision Monocular As Per Mha Qr (v2) (q2)##quantity: 500## 2025-08-11
India Creation Of Electrical Network By Creating Infrastructure By Extending 11kv Ht Lines, Erection Of 25kva, Enhancement Of 25kva By 63kva 1-star Rated Distribution Transformers And Extension Of 3 Phase 4 Wire Lt Line For Energisation Of 387 Nos. Of Irrigatio 2025-08-11
India Sale Of Property By Au Small Finance Bank Limited, Jaipur V/s. Rathod Pavan Kumar 2025-08-11
India Pin ( For Curve Roll ). .#* Pin ( For Curve Roll ) To Rcf Drg. No. Lw05124 Alt. Nil. Matl. & Spec. As Per Drg. [ Warranty period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation 2025-08-11
Whats app