Filter Search


Asia-Pacific


Location Summary Deadline
Japan Box Culvert Production Set 2024-11-19
-Construction-Of-Cement-Concrete-Road-From-Shop-Of-Nironjon-Purokait>India -Construction-Of-Cement-Concrete-Road-From-Shop-Of-Nironjon-Purokait>Wbsdb/ee/ced-i/nit-11(e)/24-25 Sl-8
Construction Of Cement Concrete Road From Shop Of Nironjon Purokait
-Construction-Of-Cement-Concrete-Road-From-Shop-Of-Nironjon-Purokait>2024-11-19
Japan Animal Facility High Pressure Steam Sterilizer Overhaul 1 Set 2024-11-19
Japan Rental And Maintenance Set Of Inkjet Printers For Procurement Executives In Fiscal Year 2024 2024-11-19
Thailand Construction Of Expansion Area - Improvement Of Electricity Distribution System, Nong Tamlueng Subdistrict Municipality Office 2024-11-19
-Single-Ss-Braided-Stainless-Steel-Metallic-Bellow-Type-Flexible-Hose-To-Size:40nbx1mtr(oal)long-With-Mild-Steel,galvanished-1-1/2"bsp-Female-Swivel-Fittings-At-Both-Ends,hose-Suitable-For-Working-Pressure:>India -Single-Ss-Braided-Stainless-Steel-Metallic-Bellow-Type-Flexible-Hose-To-Size:40nbx1mtr(oal)long-With-Mild-Steel,galvanished-1-1/2"bsp-Female-Swivel-Fittings-At-Both-Ends,hose-Suitable-For-Working-Pressure:>Supply Of Single Ss Braided Stainless Steel
Single Ss Braided Stainless Steel Metallic Bellow Type Flexible Hose To Size:40nbx1mtr(oal)long With Mild Steel,galvanished 1-1/2"bsp Female Swivel Fittings At Both Ends,hose Suitable For Working Pressure:
-Single-Ss-Braided-Stainless-Steel-Metallic-Bellow-Type-Flexible-Hose-To-Size:40nbx1mtr(oal)long-With-Mild-Steel,galvanished-1-1/2"bsp-Female-Swivel-Fittings-At-Both-Ends,hose-Suitable-For-Working-Pressure:>2024-11-19
Japan Electric Power To Be Consumed At Kudan Joint Government Building And Other Offices. ; Estimated Annual Consumption Of 14, 256, 640kwh 2024-11-19
Taiwan Province of China Construction Of Track Container Inspection Instrument At The Instrument Inspection Station Of The Second Container Center 2024-11-19
Japan Secondary Surveillance Rader 1 Set And 4 Items. 2024-11-19
-Repairing-Of-1-No.-Pump-House,-Toilet-Unit-At-1st-Tubewell-Site-For-Kachuberia-(ph-1,-Phe-Rest-House)-W/s-Scheme,-Block---Sagar-For-Implementation-Of-Jjm-Under-Ksd-Of-Ad,-P.h.e.-Dte.-(sm/08801)>India -Repairing-Of-1-No.-Pump-House,-Toilet-Unit-At-1st-Tubewell-Site-For-Kachuberia-(ph-1,-Phe-Rest-House)-W/s-Scheme,-Block---Sagar-For-Implementation-Of-Jjm-Under-Ksd-Of-Ad,-P.h.e.-Dte.-(sm/08801)>Phed/ae/niet-06/ksd/2024-25_1
Repairing Of 1 No. Pump House, Toilet Unit At 1st Tubewell Site For Kachuberia (ph-1, Phe Rest House) W/s Scheme, Block - Sagar For Implementation Of Jjm Under Ksd Of Ad, P.h.e. Dte. (sm/08801)
-Repairing-Of-1-No.-Pump-House,-Toilet-Unit-At-1st-Tubewell-Site-For-Kachuberia-(ph-1,-Phe-Rest-House)-W/s-Scheme,-Block---Sagar-For-Implementation-Of-Jjm-Under-Ksd-Of-Ad,-P.h.e.-Dte.-(sm/08801)>2024-11-19
Whats app