Filter Search


Asia-Pacific


Location Summary Deadline
Thailand Real Estate Management Service Contract 2024-11-29
India Day To Day Operation And Maintenance Of Distribution System And Rising Main Pipeline (di/ci/upvc/hdpe), Rbtw With Collecting Line, Stand Post, Functional Household Tape Connection And Operation Of Sluice Valve Of Sarenga Water Supply Scheme Under Bankura 2024-11-29
India Supply Of Brake Valve Plasser Part No. 90345 Substitute 90254/h Make Plasser Or Schrader (lt-391) [ Warranty Period: 30 Months After The Date Of Delivery ] ]pneumatic Valve Plasser Part No. 90362 Make Plasser Or Duncan (earlier Knownas Schrader) (lt-389) 2024-11-29
Japan A: Electricity Used In The Wakayama National College Of Technology Campus Area: Contracted Power 315kw, Planned Annual Power Consumption 922,096kwh, B: Electricity Used In The Wakayama National College Of Technology Dormitory Area: Contracted Power 250kw, 2024-11-29
India Operation And Maintenance Of Distribution And Rising Main, Pipe Line (ci/di/ac/upvc/hdpe), Street Stand Post Of Taldangra W/s Scheme Including Operation Of Sluice Valve Under Bankura Division, P.h.e. Dte. 2024-11-29
Japan Pfi Based Design, Construction And Maintenance Of "j4 Bldg." 2024-11-29
Japan Transmitting Adaptive Optics System: Procurement Of Optical Devices For Adaptive Optics Systems For Satellite Constellations, Complete Set 2024-11-29
India Sale Of Scrap At East Central Railway. 2024-11-29
Japan Purchase Of Fixtures And Equipment For The Establishment Of The Okuma Analytical And Research Center Satellite Office 2024-11-29
Japan "joyo" Heat Sink Material Connection Duct Etc. Production Set 2024-11-29
Whats app