Filter Search


Asia-Pacific


Location Summary Deadline
India Mechanical Gate Works 2026-01-20
India 1/2 Inch Hose Pipe With Socket & Flange .#* 1/2 Inch Hose Pipe With Socket & Flange (from Reservoir To Apm) In Assembled Condition as Per Drg. No. Wd-09034-s-11, Item-23, Alt-10 Or W/vb-1297/k, Alt- Nil For Mbs Wagon [ Warranty P eriod: 36 Months After Th 2026-01-20
Japan Nict Center For Information And Neural Networks Facility Management Operations, 1 Set 2026-01-20
India Pantograph Assembly Complete For High Speed Ac Locos .#* Pantograph Assembly Complete For High Speed Ac Locos With Motor Assembly, Mechanism assembly, Throttle Valve Assembly And Fitted With Metalized Carbon Strips As Per Rdso Drg. No. Skel-43 03 (rev-6). 2026-01-20
-Installation-Of-6nos-Solar-Light-Near-The-H/o-,i)-Kalu-Kahar-Ii)-H/o-Raba-Kahar,-Iii)-Biswajit-Kahar-,-Iv)-Supriya-Mondal,-V)-Mintu-Kahar-Vi-Battala-Near-The-House-Of-Gopal-Mondal-At-Raghunathpur-(apas/01/099/150/0013)>India -Installation-Of-6nos-Solar-Light-Near-The-H/o-,i)-Kalu-Kahar-Ii)-H/o-Raba-Kahar,-Iii)-Biswajit-Kahar-,-Iv)-Supriya-Mondal,-V)-Mintu-Kahar-Vi-Battala-Near-The-House-Of-Gopal-Mondal-At-Raghunathpur-(apas/01/099/150/0013)>336/ps/apas Sl 61
Installation Of 6nos Solar Light Near The H/o ,i) Kalu Kahar Ii) H/o Raba Kahar, Iii) Biswajit Kahar , Iv) Supriya Mondal, V) Mintu Kahar Vi Battala Near The House Of Gopal Mondal At Raghunathpur (apas/01/099/150/0013)
-Installation-Of-6nos-Solar-Light-Near-The-H/o-,i)-Kalu-Kahar-Ii)-H/o-Raba-Kahar,-Iii)-Biswajit-Kahar-,-Iv)-Supriya-Mondal,-V)-Mintu-Kahar-Vi-Battala-Near-The-House-Of-Gopal-Mondal-At-Raghunathpur-(apas/01/099/150/0013)>2026-01-20
India Supply Of Pump Plasser Part No. Hy709x71l/dfr+28l/dfr Make Plasser Or Rexroth Or Denison Or Danfoss [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-01-20
-Construction-Of-Cc-Road-From-The-H/o-prasanta-Mondal-Upto-The-H/o-kalipada-Mallick-At-Kankrasuti-Jl-No-29,sn-No-x,l-76mtr,w-1.8mtr.-(apas/01/099/178/0004)>India -Construction-Of-Cc-Road-From-The-H/o-prasanta-Mondal-Upto-The-H/o-kalipada-Mallick-At-Kankrasuti-Jl-No-29,sn-No-x,l-76mtr,w-1.8mtr.-(apas/01/099/178/0004)>336/ps/apas Sl 51
Construction Of Cc Road From The H/o-prasanta Mondal Upto The H/o-kalipada Mallick At Kankrasuti Jl No-29,sn No-x,l-76mtr,w-1.8mtr. (apas/01/099/178/0004)
-Construction-Of-Cc-Road-From-The-H/o-prasanta-Mondal-Upto-The-H/o-kalipada-Mallick-At-Kankrasuti-Jl-No-29,sn-No-x,l-76mtr,w-1.8mtr.-(apas/01/099/178/0004)>2026-01-20
-Construction-Of-Baundary-Wall-At-Purbajaynagar-Purba-Para-Fp-School-Ground-L-220,-H-5-At-Mouza-Purba-Jaynagar-Jl-No-110-(apas/01/098/264/0013)>India -Construction-Of-Baundary-Wall-At-Purbajaynagar-Purba-Para-Fp-School-Ground-L-220,-H-5-At-Mouza-Purba-Jaynagar-Jl-No-110-(apas/01/098/264/0013)>336/ps/apas Sl 88
Construction Of Baundary Wall At Purbajaynagar Purba Para Fp School Ground L-220, H-5 At Mouza Purba Jaynagar Jl No 110 (apas/01/098/264/0013)
-Construction-Of-Baundary-Wall-At-Purbajaynagar-Purba-Para-Fp-School-Ground-L-220,-H-5-At-Mouza-Purba-Jaynagar-Jl-No-110-(apas/01/098/264/0013)>2026-01-20
Japan Procurement Of High Performance Computers For Data Analysis Of 33 Sets. 2026-01-20
-Construction-Of-Cc-Road-From-H/o-Arjun-Chowduli-To-Tapan-Karmakar-At-Masia-,booth-No-218,jl-No-30,l-200ft,-W-6-Ft-(apas/01/098/218/0004)>India -Construction-Of-Cc-Road-From-H/o-Arjun-Chowduli-To-Tapan-Karmakar-At-Masia-,booth-No-218,jl-No-30,l-200ft,-W-6-Ft-(apas/01/098/218/0004)>336/ps/apas Sl 79
Construction Of Cc Road From H/o Arjun Chowduli To Tapan Karmakar At Masia ,booth No-218,jl No-30,l-200ft, W-6 Ft (apas/01/098/218/0004)
-Construction-Of-Cc-Road-From-H/o-Arjun-Chowduli-To-Tapan-Karmakar-At-Masia-,booth-No-218,jl-No-30,l-200ft,-W-6-Ft-(apas/01/098/218/0004)>2026-01-20
Whats app