Filter Search


Asia-Pacific


Location Summary Deadline
India Allotment Of Compartment D At Ryan Grain Market Admeasuring 1647.91 Sq. M. At Elphinstone Estate Rr Zone 3-35c Elphinstone Estate On As Is Where Is Basis Through E-tender Cum E-auction Methodology On Annual Rent Basis For A Period Of 10 Years 2024-11-25
Japan Geospatial Information Authority Of Japan Automatic Telephone Switching Equipment Manufacturing (electronic Bidding) 2024-11-25
-Wear-Plate-Confirming-To-Plasser-Part-No.-62.08.10085-As-Per-Rdso-Specification:-Tm/hm/6/15-Rev-2-(2015)-[-Warranty-Period:-9-Months-After-The-Date-Of-Delivery-]-]>India -Wear-Plate-Confirming-To-Plasser-Part-No.-62.08.10085-As-Per-Rdso-Specification:-Tm/hm/6/15-Rev-2-(2015)-[-Warranty-Period:-9-Months-After-The-Date-Of-Delivery-]-]>Supply Of Wear Plate Confirming To Plasser Part No. 62.08.10185
Wear Plate Confirming To Plasser Part No. 62.08.10085 As Per Rdso Specification: Tm/hm/6/15 Rev-2 (2015) [ Warranty Period: 9 Months After The Date Of Delivery ] ]
-Wear-Plate-Confirming-To-Plasser-Part-No.-62.08.10085-As-Per-Rdso-Specification:-Tm/hm/6/15-Rev-2-(2015)-[-Warranty-Period:-9-Months-After-The-Date-Of-Delivery-]-]>2024-11-25
-Construction-Of-Boundary-Wall,-Pump-House-And-Toilet,sedel-Room,-Laying-Hdpe-Pipe-Line-Of-Aguri-Band-Punisol-And-Adjoining-Mouzas-Water-Supply-Scheme-(zone-e)-Under-Onda>India -Construction-Of-Boundary-Wall,-Pump-House-And-Toilet,sedel-Room,-Laying-Hdpe-Pipe-Line-Of-Aguri-Band-Punisol-And-Adjoining-Mouzas-Water-Supply-Scheme-(zone-e)-Under-Onda>Niet No - 22 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte. (2nd Call) (sl.no-13)
Construction Of Boundary Wall, Pump House And Toilet,sedel Room, Laying Hdpe Pipe Line Of Aguri Band Punisol And Adjoining Mouzas Water Supply Scheme (zone-e) Under Onda
-Construction-Of-Boundary-Wall,-Pump-House-And-Toilet,sedel-Room,-Laying-Hdpe-Pipe-Line-Of-Aguri-Band-Punisol-And-Adjoining-Mouzas-Water-Supply-Scheme-(zone-e)-Under-Onda>2024-11-25
India Supply, Installation, Testing & Commissioning Of Kavach On Gd & Gq Routes (688 Rkm) Including Associated Works On Section Of Kharagpur & Chakradharpur Division Of South Eastern Railway 2024-11-25
-Construction-Of-Pump-House-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-At-Anandapur-Intake-Site-For-Augmentation-Of-Sub-Surface-Wat>India -Construction-Of-Pump-House-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-At-Anandapur-Intake-Site-For-Augmentation-Of-Sub-Surface-Wat>Niet No - 21 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte. (2nd Call)(sl.no-11)
Construction Of Pump House Including Plinth Protection, Ramp Etc. According To Departmental Design And Drawing At Anandapur Intake Site For Augmentation Of Sub Surface Wat
-Construction-Of-Pump-House-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-At-Anandapur-Intake-Site-For-Augmentation-Of-Sub-Surface-Wat>2024-11-25
-Stopper-Assembly-For-Pin-For-Brake-Block-Hanger-Bracket-To-Icf-Drg.-No.-T-0-3-676-Alt.-c/3.-Matl.&spec.-As-Per-Drg.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity>India -Stopper-Assembly-For-Pin-For-Brake-Block-Hanger-Bracket-To-Icf-Drg.-No.-T-0-3-676-Alt.-c/3.-Matl.&spec.-As-Per-Drg.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity>Supply Of Stopper Assembly For Pin For Brake Block Hanger Bracket
Stopper Assembly For Pin For Brake Block Hanger Bracket To Icf Drg. No. T-0-3-676 Alt.-c/3. Matl.&spec. As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity
-Stopper-Assembly-For-Pin-For-Brake-Block-Hanger-Bracket-To-Icf-Drg.-No.-T-0-3-676-Alt.-c/3.-Matl.&spec.-As-Per-Drg.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity>2024-11-25
-Subsea-Production-System-At-Chandrika-And-Gs-49-Kakinada-Eoa>India -Subsea-Production-System-At-Chandrika-And-Gs-49-Kakinada-Eoa>Subsea Production System
Subsea Production System At Chandrika And Gs-49 Kakinada Eoa
-Subsea-Production-System-At-Chandrika-And-Gs-49-Kakinada-Eoa>2024-11-25
-Piston-Seal-(modified)-For-Reverser,winding-Change-Over-Switch-And-Tap-Changer-Contactors-Of-Bhel-Emus-As-Per-M/s-Bhel's-Drg.no.-2580>India -Piston-Seal-(modified)-For-Reverser,winding-Change-Over-Switch-And-Tap-Changer-Contactors-Of-Bhel-Emus-As-Per-M/s-Bhel's-Drg.no.-2580>Supply Of Piston Washer (modified) For Reverser,winding Change Over Switch And Tap Changer Contactors Of Bhel Emus.
Piston Seal (modified) For Reverser,winding Change Over Switch And Tap Changer Contactors Of Bhel Emus As Per M/s Bhel's Drg.no. 2580
-Piston-Seal-(modified)-For-Reverser,winding-Change-Over-Switch-And-Tap-Changer-Contactors-Of-Bhel-Emus-As-Per-M/s-Bhel's-Drg.no.-2580>2024-11-25
Korea Republic of Gangneung City Integrated Public Rental Housing Construction Project Basic And Detailed Design Service Design Competition 2024-11-25
Whats app