Filter Search


Asia-Pacific


Location Summary Deadline
-Construction-Of-Boundary-Wall-Approx-60-Mtr-Long-Of-Karisunda-Water-Supply-Scheme-(brgf)-(4th-T/w-Site)-At-Mouza-Belbandhi-(j.l-No-22,-Plot-No-8)-In-Indas-Block-Under-Bish>India -Construction-Of-Boundary-Wall-Approx-60-Mtr-Long-Of-Karisunda-Water-Supply-Scheme-(brgf)-(4th-T/w-Site)-At-Mouza-Belbandhi-(j.l-No-22,-Plot-No-8)-In-Indas-Block-Under-Bish>Niet No - 21 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte. (2nd Call)(sl.no-01)
Construction Of Boundary Wall Approx 60 Mtr Long Of Karisunda Water Supply Scheme (brgf) (4th T/w Site) At Mouza Belbandhi (j.l No-22, Plot No-8) In Indas Block Under Bish
-Construction-Of-Boundary-Wall-Approx-60-Mtr-Long-Of-Karisunda-Water-Supply-Scheme-(brgf)-(4th-T/w-Site)-At-Mouza-Belbandhi-(j.l-No-22,-Plot-No-8)-In-Indas-Block-Under-Bish>2024-11-25
-Construction-Of-Pump-House-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-At-Saltora-Z-i-Ohr-Site-For-Augmentation-Of-Sub-Surface-Wat>India -Construction-Of-Pump-House-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-At-Saltora-Z-i-Ohr-Site-For-Augmentation-Of-Sub-Surface-Wat>Niet No - 22 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte. (2nd Call) (sl.no-15)
Construction Of Pump House Including Plinth Protection, Ramp Etc. According To Departmental Design And Drawing At Saltora Z-i Ohr Site For Augmentation Of Sub Surface Wat
-Construction-Of-Pump-House-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-At-Saltora-Z-i-Ohr-Site-For-Augmentation-Of-Sub-Surface-Wat>2024-11-25
India Supply Of " Book Ruled Size 20.5 Cm Width X 33 Cms Long 1 Quire 65gsm Paper With Left Margin And Top Margin In Red. Folios Shall Be Machine Numbered Serially At Top Corner And Hard Bound With Printing ''government Of India, Indian Railways, Railwheel Fact 2024-11-25
-Dump-Valve-Connector-Assy-For-Lhb-Coaches-Ftrtipl-Part-No.-Ft0053671-102-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Pe>India -Dump-Valve-Connector-Assy-For-Lhb-Coaches-Ftrtipl-Part-No.-Ft0053671-102-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Pe>Supply Of Dump Valve Connector
Dump Valve Connector Assy For Lhb Coaches Ftrtipl Part No. Ft0053671-102 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Pe
-Dump-Valve-Connector-Assy-For-Lhb-Coaches-Ftrtipl-Part-No.-Ft0053671-102-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Pe>2024-11-25
-Construction-Of-Guard-Room-And-Toilet-With-Sanitary-And-Water-Supply-Arrangement-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-For-A>India -Construction-Of-Guard-Room-And-Toilet-With-Sanitary-And-Water-Supply-Arrangement-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-For-A>Niet No - 22 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte. (2nd Call) (sl.no-10)
Construction Of Guard Room And Toilet With Sanitary And Water Supply Arrangement Including Plinth Protection, Ramp Etc. According To Departmental Design And Drawing For A
-Construction-Of-Guard-Room-And-Toilet-With-Sanitary-And-Water-Supply-Arrangement-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-For-A>2024-11-25
Japan Packet Collection, Analysis And Transfer System, 1 Set 2024-11-25
-3/8-Inch-Straight-Nipple,-Material:-Mild-Steel,-As-Per-Clw-Drg.-No.-Clw/ac/132-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -3/8-Inch-Straight-Nipple,-Material:-Mild-Steel,-As-Per-Clw-Drg.-No.-Clw/ac/132-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of 3/8 Inch Straight Nipple, Material
3/8 Inch Straight Nipple, Material: Mild Steel, As Per Clw Drg. No. Clw/ac/132 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-3/8-Inch-Straight-Nipple,-Material:-Mild-Steel,-As-Per-Clw-Drg.-No.-Clw/ac/132-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-11-25
-Construction-Of-High-Lift-Pump-House-With-All-Allied-Works-At-Onda-(zone--Ii),-Tella-Site-Under-Rejuvenation-Of-Sub-surface-Water-Based-Water-Supply-Scheme-For-Onda-Under>India -Construction-Of-High-Lift-Pump-House-With-All-Allied-Works-At-Onda-(zone--Ii),-Tella-Site-Under-Rejuvenation-Of-Sub-surface-Water-Based-Water-Supply-Scheme-For-Onda-Under>Niet No - 21 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte. (2nd Call)(sl.no-08)
Construction Of High Lift Pump House With All Allied Works At Onda (zone- Ii), Tella Site Under Rejuvenation Of Sub-surface Water Based Water Supply Scheme For Onda Under
-Construction-Of-High-Lift-Pump-House-With-All-Allied-Works-At-Onda-(zone--Ii),-Tella-Site-Under-Rejuvenation-Of-Sub-surface-Water-Based-Water-Supply-Scheme-For-Onda-Under>2024-11-25
-Led-Light-Fitting-For-Passenger-Alarm-Chain-Coach-Indication-Light-Conforming>India -Led-Light-Fitting-For-Passenger-Alarm-Chain-Coach-Indication-Light-Conforming>Supply Of Led Light Fitting For Passenger Alarm Chain Coach Indication Light Conforming To Specs No. Rdso/pe/spec/tl/0091-2016, Rev-1 & Rcf Drg. No. Lw 76098 Type-i (3w).
Led Light Fitting For Passenger Alarm Chain Coach Indication Light Conforming
-Led-Light-Fitting-For-Passenger-Alarm-Chain-Coach-Indication-Light-Conforming>2024-11-25
Japan Facility-cleaning Service For Hospital 1 Set 2024-11-25
Whats app