Filter Search


Asia-Pacific


Location Summary Deadline
-Articulation-Bearing-(sub-assembly)-For-Schaku-Coupler-Of-Emu-Coaches-To-(i)-M/s-Escorts-Drg.no.-40-sk-1960-(3)-(ii)-M/s-Wsf's-Drg.-No.-40-sk-3021-(4)-(iii)-M/s-Sanrok's>India -Articulation-Bearing-(sub-assembly)-For-Schaku-Coupler-Of-Emu-Coaches-To-(i)-M/s-Escorts-Drg.no.-40-sk-1960-(3)-(ii)-M/s-Wsf's-Drg.-No.-40-sk-3021-(4)-(iii)-M/s-Sanrok's>Supply Of Articulation Bearing (sub-assembly) For Schaku Coupler Of Emu Coaches
Articulation Bearing (sub-assembly) For Schaku Coupler Of Emu Coaches To (i) M/s Escorts Drg.no. 40-sk-1960 (3) (ii) M/s Wsf's Drg. No. 40-sk-3021 (4) (iii) M/s Sanrok's
-Articulation-Bearing-(sub-assembly)-For-Schaku-Coupler-Of-Emu-Coaches-To-(i)-M/s-Escorts-Drg.no.-40-sk-1960-(3)-(ii)-M/s-Wsf's-Drg.-No.-40-sk-3021-(4)-(iii)-M/s-Sanrok's>2024-11-06
Japan Purchase Of Personal Computers, Etc. - Quantity Is Based On The Separate Specifications. 2024-11-06
-New-Sinking-Of-2-(two)-Nos-200-Mm-Dia-River-Bed-Vertical-Tubewell-Alongwith-Necessary-110-Mm-Dia-Hdpe-Collecting-Line-From-River-Bed-Tubewell-To-Common-Manifold-Chamber-At-River-Bank-(damodar-River)-At-Bhamuria-W/s-Scheme>India -New-Sinking-Of-2-(two)-Nos-200-Mm-Dia-River-Bed-Vertical-Tubewell-Alongwith-Necessary-110-Mm-Dia-Hdpe-Collecting-Line-From-River-Bed-Tubewell-To-Common-Manifold-Chamber-At-River-Bank-(damodar-River)-At-Bhamuria-W/s-Scheme>Wbphed/09/pd/2024-25/sl.36
New Sinking Of 2 (two) Nos 200 Mm Dia River Bed Vertical Tubewell Alongwith Necessary 110 Mm Dia Hdpe Collecting Line From River Bed Tubewell To Common Manifold Chamber At River Bank (damodar River) At Bhamuria W/s Scheme
-New-Sinking-Of-2-(two)-Nos-200-Mm-Dia-River-Bed-Vertical-Tubewell-Alongwith-Necessary-110-Mm-Dia-Hdpe-Collecting-Line-From-River-Bed-Tubewell-To-Common-Manifold-Chamber-At-River-Bank-(damodar-River)-At-Bhamuria-W/s-Scheme>2024-11-06
India Auction Sale Of Immovable Property, Land And Building, Plot. 2024-11-06
India Auction Sale Of Plot No 149 Me Ajmer Chosla Arai Granite 2024-11-06
-Laying-Distribution-Pipe-Line-And-Providing-Functional-Household-Tap-Connection-(fhtc)-Including-Other-Allied-Work-At-Gap-Portion-Of-Tiyashi-For-Zone-iv-Of-Santuri-Block-Under-Purulia-Pipe-Water-Supply-Scheme-(northern-Sec>India -Laying-Distribution-Pipe-Line-And-Providing-Functional-Household-Tap-Connection-(fhtc)-Including-Other-Allied-Work-At-Gap-Portion-Of-Tiyashi-For-Zone-iv-Of-Santuri-Block-Under-Purulia-Pipe-Water-Supply-Scheme-(northern-Sec>Wbphed/09/pd/2024-25/sl.33
Laying Distribution Pipe Line And Providing Functional Household Tap Connection (fhtc) Including Other Allied Work At Gap Portion Of Tiyashi For Zone-iv Of Santuri Block Under Purulia Pipe Water Supply Scheme (northern Sec
-Laying-Distribution-Pipe-Line-And-Providing-Functional-Household-Tap-Connection-(fhtc)-Including-Other-Allied-Work-At-Gap-Portion-Of-Tiyashi-For-Zone-iv-Of-Santuri-Block-Under-Purulia-Pipe-Water-Supply-Scheme-(northern-Sec>2024-11-06
-3-Phase-Measuring-And-Monitoring-Relay-Rated-Voltage-Looo-V-Ac-For-Net1-Net-2-As-Per-Rdso-Specn.-No.-Rdso/pe/spec/ac/0184-2015-(rev.1)-&-Rdso-Letter-No.el/7.1.108/mssbc,dt.17/09/2021.-Make:-M/s.-Carlo-Gavazzi-Model-No.dp>India -3-Phase-Measuring-And-Monitoring-Relay-Rated-Voltage-Looo-V-Ac-For-Net1-Net-2-As-Per-Rdso-Specn.-No.-Rdso/pe/spec/ac/0184-2015-(rev.1)-&-Rdso-Letter-No.el/7.1.108/mssbc,dt.17/09/2021.-Make:-M/s.-Carlo-Gavazzi-Model-No.dp>Supply Of 3 Phase Measuring.
3 Phase Measuring And Monitoring Relay Rated Voltage Looo V Ac For Net1 Net 2 As Per Rdso Specn. No. Rdso/pe/spec/ac/0184-2015 (rev.1) & Rdso Letter No.el/7.1.108/mssbc,dt.17/09/2021. Make: M/s. Carlo Gavazzi Model No.dp
-3-Phase-Measuring-And-Monitoring-Relay-Rated-Voltage-Looo-V-Ac-For-Net1-Net-2-As-Per-Rdso-Specn.-No.-Rdso/pe/spec/ac/0184-2015-(rev.1)-&-Rdso-Letter-No.el/7.1.108/mssbc,dt.17/09/2021.-Make:-M/s.-Carlo-Gavazzi-Model-No.dp>2024-11-06
India Supply Of Ofloxacin 100 Mg + Metronidazole 200 Mg Per 5 Ml, Atleast 30 Ml Syrup ] 2024-11-06
Japan Fy2024: Support For The Study Of A Common Infrastructure For Managing Personnel Information Aimed At Establishing A System To Streamline And Enhance Personnel Management Operations In Each Ministry And Agency 2024-11-06
-Widening-&-Strengthening-Of-Navagam-bhad-erda-nerana-Road-Km-0/00-To-21/300-(from-3.75-To-5.50-Mt).>India -Widening-&-Strengthening-Of-Navagam-bhad-erda-nerana-Road-Km-0/00-To-21/300-(from-3.75-To-5.50-Mt).>Strengthening Of Kutiyana-mahiyari-bagsara Road Km 0/00 (providing Cement Concrete Road Box Culvert Head Wall Road Furniture Etc) (sh-96).
Widening & Strengthening Of Navagam-bhad-erda-nerana Road Km 0/00 To 21/300 (from 3.75 To 5.50 Mt).
-Widening-&-Strengthening-Of-Navagam-bhad-erda-nerana-Road-Km-0/00-To-21/300-(from-3.75-To-5.50-Mt).>2024-11-06
Whats app