Filter Search


Asia-Pacific


Location Summary Deadline
Russian Federation 907-s130-24/54 Provision Of Information Technology Services 2024-11-06
-Set-Of-Fixed-And-Mobile-Contact-Of-Higher-Capacity-For-Em-Contactor.fixed-Contact-Tip-To-Drg.no.3twd-291.003-Alt-8-Ref.4-Mobile-Contact-Tip-To-Drg.no.-3twd-291.004-Alt-12-Ref.1(one-Set-Consisting-Of-One-No-F>India -Set-Of-Fixed-And-Mobile-Contact-Of-Higher-Capacity-For-Em-Contactor.fixed-Contact-Tip-To-Drg.no.3twd-291.003-Alt-8-Ref.4-Mobile-Contact-Tip-To-Drg.no.-3twd-291.004-Alt-12-Ref.1(one-Set-Consisting-Of-One-No-F>Supply Of Set Of Fixed And Mobile Contact
Set Of Fixed And Mobile Contact Of Higher Capacity For Em Contactor.fixed Contact Tip To Drg.no.3twd 291.003 Alt 8 Ref.4 Mobile Contact Tip To Drg.no. 3twd 291.004 Alt-12 Ref.1(one Set Consisting Of One No F
-Set-Of-Fixed-And-Mobile-Contact-Of-Higher-Capacity-For-Em-Contactor.fixed-Contact-Tip-To-Drg.no.3twd-291.003-Alt-8-Ref.4-Mobile-Contact-Tip-To-Drg.no.-3twd-291.004-Alt-12-Ref.1(one-Set-Consisting-Of-One-No-F>2024-11-06
-Graphite-Flake-To-Is-495/67-Or-Latest-In-50-Kgs.-Bag-In-Mfrg.original-Packing.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Pe>India -Graphite-Flake-To-Is-495/67-Or-Latest-In-50-Kgs.-Bag-In-Mfrg.original-Packing.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Pe>Supply Of Graphite Flake
Graphite Flake To Is 495/67 Or Latest In 50 Kgs. Bag In Mfrg.original Packing. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Pe
-Graphite-Flake-To-Is-495/67-Or-Latest-In-50-Kgs.-Bag-In-Mfrg.original-Packing.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Pe>2024-11-06
Australia Provision Of Independent Environmental Auditor (tunnels & Civils) 2024-11-06
Thailand Aaj-hiring Turn Key To Improve The Distribution System, Adding Circuit 185 Sac Connecting F3 From Egat Mae Rim To Egat Samoeng (ban Tung Hua Chang To Ban Pang Da) Sections 1 To 13 2024-11-06
-Distribution-Of-70-Lt.-Insulated-Box-With-Weighing-Machine-To-The-Fish-Vendors/sellers-For-Alipurduar-District-During-The-Fy-2024-25>India -Distribution-Of-70-Lt.-Insulated-Box-With-Weighing-Machine-To-The-Fish-Vendors/sellers-For-Alipurduar-District-During-The-Fy-2024-25>Wbdof/adf/apd/e-nit-03 /2024-25
Distribution Of 70 Lt. Insulated Box With Weighing Machine To The Fish Vendors/sellers For Alipurduar District During The Fy 2024-25
-Distribution-Of-70-Lt.-Insulated-Box-With-Weighing-Machine-To-The-Fish-Vendors/sellers-For-Alipurduar-District-During-The-Fy-2024-25>2024-11-06
-Emergency-Piling-Work-Along-With-Sand-Filling-For-Protecting-The-Riverbed-Tubewell-Alongwith-Collecting-Line-Against-Flash-Flood-At-Manbazar-i-W/s-Scheme-Under-Purulia-Division,-Phe-Dte.>India -Emergency-Piling-Work-Along-With-Sand-Filling-For-Protecting-The-Riverbed-Tubewell-Alongwith-Collecting-Line-Against-Flash-Flood-At-Manbazar-i-W/s-Scheme-Under-Purulia-Division,-Phe-Dte.>Wbphed/09/pd/2024-25/sl.19
Emergency Piling Work Along With Sand Filling For Protecting The Riverbed Tubewell Alongwith Collecting Line Against Flash Flood At Manbazar-i W/s Scheme Under Purulia Division, Phe Dte.
-Emergency-Piling-Work-Along-With-Sand-Filling-For-Protecting-The-Riverbed-Tubewell-Alongwith-Collecting-Line-Against-Flash-Flood-At-Manbazar-i-W/s-Scheme-Under-Purulia-Division,-Phe-Dte.>2024-11-06
Korea Republic of Detailed Design Service For Improving Safety Facilities At 37 Crossings Including The Bukpyeong Line Buksam Crossing 2024-11-06
India Construction Of Temporary Structures Of Police Staffs (ri Complex) And Temporary Special Latrine In C/with Gs Mela-2025 Under Kakdwip Sub-division Of Alipore Division, Phe Dte. 2024-11-06
-Led-Marker-Light-To-Drg/specn.-No.(-I)-Elrs-/spec-/pr-/-0022-(-Rev.1-,oct-2004)-Except-Page-No.-24-(ii)-Clw/es/sk-1/l-29-Alt-a.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Led-Marker-Light-To-Drg/specn.-No.(-I)-Elrs-/spec-/pr-/-0022-(-Rev.1-,oct-2004)-Except-Page-No.-24-(ii)-Clw/es/sk-1/l-29-Alt-a.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Led Marker Light
Led Marker Light To Drg/specn. No.( I) Elrs /spec /pr / 0022 ( Rev.1 ,oct 2004) Except Page No. 24 (ii) Clw/es/sk-1/l-29 Alt-a. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Led-Marker-Light-To-Drg/specn.-No.(-I)-Elrs-/spec-/pr-/-0022-(-Rev.1-,oct-2004)-Except-Page-No.-24-(ii)-Clw/es/sk-1/l-29-Alt-a.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-11-06
Whats app