Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Expressways In Bihar Including Raxaul-haldia (407 Km), Patna-purnia (245 Km), Varanasi-kolkata (177.37 Km), Gorakhpur-siliguri (417 Km), And Proposed Buxar-bhagalpur (380 Km). Total Length Of Expressways Under Construction Is 1,626.37 Km. 2025-09-30
-Widening-From-Multi-Lane-To-Four-Lane-And-Strengthening-At-Km-28/750-31/0,-36/0-37/8-And-38/4-39/320-Of-Rayakottai---Athipalli-Road-Including-Construction-Of-Drain,-Providing-Median-Including-Cd-Works-At-Km-28/10-(i)-(i>India -Widening-From-Multi-Lane-To-Four-Lane-And-Strengthening-At-Km-28/750-31/0,-36/0-37/8-And-38/4-39/320-Of-Rayakottai---Athipalli-Road-Including-Construction-Of-Drain,-Providing-Median-Including-Cd-Works-At-Km-28/10-(i)-(i>7_rayakottai - Athipalli Road
Widening From Multi Lane To Four Lane And Strengthening At Km 28/750-31/0, 36/0-37/8 And 38/4-39/320 Of Rayakottai - Athipalli Road Including Construction Of Drain, Providing Median Including Cd Works At Km 28/10 (i) (i
-Widening-From-Multi-Lane-To-Four-Lane-And-Strengthening-At-Km-28/750-31/0,-36/0-37/8-And-38/4-39/320-Of-Rayakottai---Athipalli-Road-Including-Construction-Of-Drain,-Providing-Median-Including-Cd-Works-At-Km-28/10-(i)-(i>2025-09-30
Australia Rft 2546 Waverly Website Redevelopment Project 2025-09-30
Singapore Term Contract No.1 For Utilities Detection Works For A Period Of 36 Months 2025-09-30
India Construction Of Water Channel On Both Sides From L/o Nazir Ah Dar To L/o Ali Mohd Zai At Zasoo 2025-09-30
India Color - Blood Red .#* Synthetic Enamel Exterior Finishing Ready Mix Paint For Icf Coaches, Color - Blood Red To Shade Ral- 0303045 Confirming To I s 8662/2024 (third Revision) And Rdso Amendment No.1 (revision.0) For Pigment Content As An Additional Requi 2025-09-30
India Tetrafluroethylene Tape 4ft 0.038x32 To Specn No.a0124 Specn: 10192- 1982 Grade-ep-2. .#* Tetrafluroethylene Tape 4ft 0.038x32 To Specn No.a0124 Specn: 10192-1982 Gra de-ep-2. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-30
Malaysia Solid Waste Collection Services For A Period Of Six (6) Years For Zone A, Zone B, Zone C, Zone D, E, Zone F, G And Rr Zone 2025-09-30
India Synthetic Thermo Plastic Polymer Water Hose, Size.50mm Specification:- to Is 12585 : 2023 .#* Synthetic Thermo Plastic Polymer Water Hose, Size.50mm Specification:- To Is 1 2585 : 2023, Type-2 Special Terms & Conditions:- Hose Should Be Isi Marked. Minimu 2025-09-30
India Construction Work Of C.c. Drain In Lane No. 06, Sant Nagar, Ward No. 01. 2025-09-30
Whats app