Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Road Reparing From Kapasdanga Majhpara Main Rastha Towards Sorif House (leanth 30 Mtr. Width 3 Mtr.) Apas/01/070/67/0010 2025-12-31
India Anchor Link .#* Anchor Link Drg. No.t-0-7-603 Alt Z/15,col- Ii. [ Warranty Period: 30 Months Aft er The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitt ed: Max 8 Lacs ] ] 2025-12-31
India Appointment Of Junior Engineers (civil/electrical/mechanical) In The Building Construction Department. Junior Engineer (civil), Junior Engineer (electrical), Junior Engineer (mechanical) 2025-12-31
Malaysia Request For Proposal (rfp) For The Provision Of Professional Photography Services And Products For Tourism Promotion At Penang Hill, Ayer Itam, 11500 Penang 2025-12-31
India Bza-sur (ph No.:63076) Collagen Sheets 10 Cm X 10 Cm .#* Bza-sur (ph No.:63076) Collagen Sheets 10 Cm X 10 Cm ] 2025-12-31
India Kit Of Rubber Gaskets Consisting Of 3 Sizes For 20 Nb, 25 Nb And 32 Nb Pipe flange Joints. .#* Kit Of Rubber Gaskets Consisting Of 3 Sizes For 20 Nb, 25 Nb And 32 Nb Pipe Flange Joints . Drawing No: See Details Below. Matl.& Specn :as Per Drawing. 1) For 2025-12-31
India Construction Of Drainage Work 4 Nos At 126, 128, 132, 134 No Booth Under Bamunara G.p , 2nd Call 2025-12-31
Russian Federation Supply Of Chairs And Lamps 2025-12-31
India Installation Of Submersible Pump In Existing Tube Well Near Daspukur Golam House At Daspukur 1 Hp Benefitted 120 Nos,apas/01/259/112/0013 2025-12-31
-Reconstruction-Of-Concrete-Road-From-House-Of-Subhas-Lodh-To-House-Of-Gour-Kundu-Fund-Apas-Sansad-No-17>India -Reconstruction-Of-Concrete-Road-From-House-Of-Subhas-Lodh-To-House-Of-Gour-Kundu-Fund-Apas-Sansad-No-17>Wb/hwh/bjps/cagp/nit14/25-26
Reconstruction Of Concrete Road From House Of Subhas Lodh To House Of Gour Kundu Fund Apas Sansad No 17
-Reconstruction-Of-Concrete-Road-From-House-Of-Subhas-Lodh-To-House-Of-Gour-Kundu-Fund-Apas-Sansad-No-17>2025-12-31
Whats app