Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Proposed Mechanized Laundry Building At Mouza- Baje Garail, Jl No. 86, Lr Plot No. 19, 18/155, Ps- Gazole, Dist - Malda Under Malda Division, Pwd. 2025-08-11
India Auction Sale Of Flat No. 306, Admeasuring About 628 Sq. Fts.*#. All That Piece And Parcel Of The Flat No. 306, On The 3rd Floor, Admeasuring About 628 Sq. Fts. I.e. 58.36 Sq. Mtrs Built Up Area, In The Building No. B/2, In The Building Known As Sai Dev Pa 2025-08-11
Thailand Procurement Of Parcel Shortages (nor. 1, Mae Sai (son) (sor) (s) 66/2568) 2025-08-11
India Procurement Of Semi-permanent Coupler End-"b" For Schaku Coupler Of Emu coaches Etc. .#* Semi-permanent Coupler End-"b" For Schaku Coupler Of Emu Coaches To (i) M/s Escorts drg. No. 40-587-(0) Except Bearing Bracket With Support To Drg. No. 40-588-07(2) ( 2025-08-11
Philippines Ib No. 2025-fa-43 - Supply And Delivery Of Hpv Qualitative Real Time Pcr Kit With Free Use Of Machine, Controls And Consumables Under Framework Agreement 2025-08-11
-Ce/eap/arrbp/ocb/bridge-1/biswanath/12-Construction-Of-Bridges-In-Biswanath-District-I)-Br.-No.-1/1-On-Bapujar-Link-Road>India -Ce/eap/arrbp/ocb/bridge-1/biswanath/12-Construction-Of-Bridges-In-Biswanath-District-I)-Br.-No.-1/1-On-Bapujar-Link-Road>Construction Of Bridges In Biswanath Distric I) Br. No. 1/1 On Bapujar Link Road
Ce/eap/arrbp/ocb/bridge-1/biswanath/12 Construction Of Bridges In Biswanath District I) Br. No. 1/1 On Bapujar Link Road
-Ce/eap/arrbp/ocb/bridge-1/biswanath/12-Construction-Of-Bridges-In-Biswanath-District-I)-Br.-No.-1/1-On-Bapujar-Link-Road>2025-08-11
India Regarding Laying A New Drainage Line From House No. 29 To 05 In Gumasta Nagar, Under Zone No. 15, Ward No. 83. 2025-08-11
India Construction Of Cc Road From Main Road To Sanjeevani School And Pande Ji House In Ambedkar Ward Betul 2025-08-11
India Aldrop For Pad Lock Arrangement. .#* Aldrop For Pad Lock Arrangement As Per Scr Drawing No. Pd/tpys/scr/drg No. C&w-108 with 08 Nos. Nut And Bolt For Fitment Of Aldrop Per Item (sample Must Be Pre Approved Before Supply). [ warranty Period: 30 Months Afte 2025-08-11
India Creation Of Electrical Network By Creating Infrastructure By Extending 11kv Ht Lines, Erection Of 25kva, Enhancement Of 25kva By 63kva 1-star Rated Distribution Transformers And Extension Of 3 Phase 4 Wire Lt Line For Energisation Of 739 Nos. Of Irrigatio 2025-08-11
Whats app