Filter Search


Asia-Pacific


Location Summary Deadline
India Widening To 2 Lane From Existing Chainage Km 74.700 To Km 100.660 (design Chainage Km 53.365 To Km 78.785) On Nh 507 In The State Uttarakhand 2024-11-20
India Surging Of 2 Nos. Tubewell (1st & 2nd T.w.) For Shibkalinagar W/s Scheme, Block - Kakdwip Under Kakdwip Sub - Division Under Division Phe Dte. 2024-11-20
India Zonal Works For Service Building Over Hmh-ii Sub Division Under Aden/hmh-ii /n.w.rly. 2024-11-20
India Addition/alteration To Security Wall Under Ge (p) Nagrota 2024-11-20
Japan 2025 Foreign Magazine Subscription (common To Groups A To G) - One Set Each 2024-11-20
-Speed-Sensor-5-pin-Plus-3-pin-Double-Coupler-Confirming-To-Btil-Pt-No.-3eyp401277-R0001-For-Igbt-Based-Locomotive-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Speed-Sensor-5-pin-Plus-3-pin-Double-Coupler-Confirming-To-Btil-Pt-No.-3eyp401277-R0001-For-Igbt-Based-Locomotive-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Speed Sensor 5-pin Plus 3-pin Double
Speed Sensor 5-pin Plus 3-pin Double Coupler Confirming To Btil Pt No. 3eyp401277 R0001 For Igbt Based Locomotive [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Speed-Sensor-5-pin-Plus-3-pin-Double-Coupler-Confirming-To-Btil-Pt-No.-3eyp401277-R0001-For-Igbt-Based-Locomotive-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-11-20
-Const-Of-Bwall-With-Gate-Drain-Land-Dev-Pway-At-Hw-Site-2nd-Tw-Site-At-Zi-Hw-Site-2nd-Tw-3rd-Tw-Site-At-Zii-And-Hw-Site-2nd-Tw-Site-At-Ziii-Incl-Balance-Portion-Of-Lds-With-Providing-Fhtc-At-Simulguri-Pwss-Under-Jalpai>India -Const-Of-Bwall-With-Gate-Drain-Land-Dev-Pway-At-Hw-Site-2nd-Tw-Site-At-Zi-Hw-Site-2nd-Tw-3rd-Tw-Site-At-Zii-And-Hw-Site-2nd-Tw-Site-At-Ziii-Incl-Balance-Portion-Of-Lds-With-Providing-Fhtc-At-Simulguri-Pwss-Under-Jalpai>Niet/se/nbc-i/04/2024-25 Sl.04
Const Of Bwall With Gate Drain Land Dev Pway At Hw Site 2nd Tw Site At Zi Hw Site 2nd Tw 3rd Tw Site At Zii And Hw Site 2nd Tw Site At Ziii Incl Balance Portion Of Lds With Providing Fhtc At Simulguri Pwss Under Jalpai
-Const-Of-Bwall-With-Gate-Drain-Land-Dev-Pway-At-Hw-Site-2nd-Tw-Site-At-Zi-Hw-Site-2nd-Tw-3rd-Tw-Site-At-Zii-And-Hw-Site-2nd-Tw-Site-At-Ziii-Incl-Balance-Portion-Of-Lds-With-Providing-Fhtc-At-Simulguri-Pwss-Under-Jalpai>2024-11-20
India Sale Of Property By Au Small Finance Bank Limited, Jaipur V/s. Manmohan Giri 2024-11-20
-Surging-Of-1-No.-Tubewell-(2nd-T.w.)-For-Augmentation-Of-Sumatinagar-Zone-ii-W/s-Scheme,-Block---Sagar-Under-Kakdwip-Sub---Division-Under-Alipore-Division-Phe-Dte.>India -Surging-Of-1-No.-Tubewell-(2nd-T.w.)-For-Augmentation-Of-Sumatinagar-Zone-ii-W/s-Scheme,-Block---Sagar-Under-Kakdwip-Sub---Division-Under-Alipore-Division-Phe-Dte.>Phed/ae/niet-07/ksd/2024-25_4
Surging Of 1 No. Tubewell (2nd T.w.) For Augmentation Of Sumatinagar Zone-ii W/s Scheme, Block - Sagar Under Kakdwip Sub - Division Under Alipore Division Phe Dte.
-Surging-Of-1-No.-Tubewell-(2nd-T.w.)-For-Augmentation-Of-Sumatinagar-Zone-ii-W/s-Scheme,-Block---Sagar-Under-Kakdwip-Sub---Division-Under-Alipore-Division-Phe-Dte.>2024-11-20
Thailand Electrical Parcels And Equipment, 4 Items, No. Ch.1sn.(kp)50/2567, By Specific Method 2024-11-20
Whats app