Filter Search


Asia-Pacific


Location Summary Deadline
-Estimate-For-The-Work-Of-Planning,-Designing,-Engineering,procurement,construction,installation,testing,commissioning-And-Trial-Run-For-3-Months-For-The-Work-Of-9-Mld-(phase-v)-Capacity-Cetp-Based-On-Activated-Sludges>India -Estimate-For-The-Work-Of-Planning,-Designing,-Engineering,procurement,construction,installation,testing,commissioning-And-Trial-Run-For-3-Months-For-The-Work-Of-9-Mld-(phase-v)-Capacity-Cetp-Based-On-Activated-Sludges>Design, Engineering, Procur...
Estimate For The Work Of Planning, Designing, Engineering,procurement,construction,installation,testing,commissioning And Trial Run For 3 Months For The Work Of 9 Mld (phase-v) Capacity Cetp Based On Activated Sludges
-Estimate-For-The-Work-Of-Planning,-Designing,-Engineering,procurement,construction,installation,testing,commissioning-And-Trial-Run-For-3-Months-For-The-Work-Of-9-Mld-(phase-v)-Capacity-Cetp-Based-On-Activated-Sludges>2025-08-07
India Leone Make Relay .#* Leone Make Relay ( P 30f C-2, 24 V Dc ) As Per Clw Specn. No. Clw/es/3/0481 Or Similar. [ warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Pe 2025-08-07
India Methycobalamin Inj, Thiamine Cap, Vitamin B Complex Inj .#* Srphc076040-vitamin B Complex Inj 2 Ml Iv Amp Unit:amp [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Ma x 8 Lacs ] ] 2025-08-07
India Laying Of Underground Gas Pipeline In Nh-716 Of Tirupati To Tiruthani To Chennai Section Along The Road From Km. 61/510 To Km. 81/540 (rhs) And Km. 107/600 To Km. 115/600 In The State Of Ap And From Km 45/500 To Km 61/510 (rhs) In The State Of Tn 2025-08-07
Japan New Construction Of Okazaki Detention Branch Office (construction) Construction 2025-08-07
India Design, Supply, Erection, Testing & Commissioning Of 132 Kv Traction Substation, Sectioning & paralleling Post (sps), And Sub Sectioning & Paralleling Post (ssps) In 2x25kv System On Muri- ranchi-tori Section Of Ranchi Division Of South Eastern Railway To 2025-08-07
India Designing And Fabrication Of Csir Pavilion Alongwith Supply And Hiring Of Extra Items In Delhi And Other States In India 2025-08-07
Japan Functional Construction Work Of Search And Rescue System 2025-08-07
India Construction Of Boundary Wall At Nanded Station. 2025-08-07
India Set Of Insulators Set Of Insulators .#* Set Of Insulators (consisting Of 03 Items) To Set List No. El 29728046 Rev.-2, specification No. Clw/es/3/0145 Alt- F, And Str No. Clw/2021/eldo/e/str/0115 Rev.- 0. [ Warr anty Period: 30 Months After The Date Of De 2025-08-07
Whats app