Filter Search


Asia-Pacific


Location Summary Deadline
Japan Japan International Cooperation Agency Hokkaido Center (sapporo) Building Management And Operation Services (fy2025-fy2029) Complete Set 2024-11-15
Japan Electricity Used At The General Spinal Cord Injury Center: Scheduled Contract Power: 1, 310 Kw; Scheduled Power Consumption: 3, 608, 000 Kwh 2024-11-15
Japan ? Training Ship Nagasaki Maru, Second-class Intermediate Inspection Work (however, The No. 2 Main Generating Engine Is Undergoing A Regular Inspection, And The No. 4 Main Generating Engine Is Undergoing A Third-class Intermediate Inspection) And General R 2024-11-15
India Const. Of Grade Separators At Sarona Chowk Ch.279.780 Udyog Bhawan Ch.269.050 And Telibandha Chowk Ch.268.120 On Raipur City Portion Of Nh53 At Raipur Aurang Sec In The State Of Chhattisgarh 2024-11-15
Japan Ordering System Update Complete Set 2024-11-15
Japan The National Museum Of Art, Next Corporation Network And Internet Connection Service 2024-11-15
India South Central Railway (construction Organization) - Engineering, Procurement And Construction (epc) Contract For "construction Of New Bg Line Sections Between Chainage 106800.00m (km. 106.800) And Chainage 111500.00m (km. 111.500) [4.70 Km] Between Pro. S 2024-11-15
India Preparation Of Dpr For Upgrad Of Nh111 New Nh130 From Km. 82.50 To Km. 215.800 Katghora Shivnagar Ambikapur Section To 4lanes Within Available Row In Chhattisgarh 2024-11-15
Japan Computer System For Library 1 Set 2024-11-15
Japan Outsourcing Of Leasing Of Equipment Etc. In Connection With The Onlineization Of Hello Work Operations (osaka City) 2024-11-15
Whats app