Filter Search


Asia-Pacific


Location Summary Deadline
India Raising Of Boundary Wall Height, Campus Development, Fencing Of Transformer Area & Construction Of Soak Pit At Government Ambedkar Girls Residential School At Sirdala. 2025-09-15
India Auction Sale Of Shop No 26 27 40 41*#. All The Piece And Parcel Of Property I: Mouje Kapadvanj C S No 6780/a First Floor Shop No 26 27 40 41 Nandni Plaza Kheda 387620 And Property Ii: Mouje Kapadvanj C S No 6780/a First Floor Shop No 42 Nandni Plaza Kheda 2025-09-15
India Supply Of Fuel Flow Meter With Complete Assembly .#* Supply Of Fuel Flow Meter With Complete Assembly Supply For Power Car.(per Unit cost Includes Packing Charge, Freight Charge & Gst). [ Warranty Period: 30 Months After The Date Of Deliv ery ] ] 2025-09-15
-Rfp-For-Imp>India -Rfp-For-Imp>Rfp For Improvement And Widening To Two Laning With Paved Shoulder Of National Highway 127b From Km. 0.000 To Km 31.500 In The State Of Meghalaya On Epc Basis Under Ne Road Network Connectivity Improvement Through Jica Oda Loan Phase-vii
Rfp For Imp
-Rfp-For-Imp>2025-09-15
India Allotment Of Land For Development Of Hotel At Plot Li/s37/r2-a, In Sector - 37 Of Nava Raipur Atal Nagar 2025-09-15
India Magnet Valve 3223c .#* Magnet Valve 3223c To Rotexs Drg. No. 081-28-001-000-1-c Or Similar. [ Warranty Pe riod: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitt ed: Max 8 2025-09-15
India Rate Contract For Comprehensive Overhauling/rehabilitation Of Power Assembly (fork: Pl No.16350017 & Blade: Pl No.16350029) Of Hhp Diesel Locos 2025-09-15
-Construction-Of-Balance-Work-Of-Bi-directional-Tunnel-At-Km-83rd-And-A-Major-Bridge-Between-Km-82.675-And-Km-82.925-On-Nh-244-In-The-Ut-Of-Jk-On-Epc-Mode>India -Construction-Of-Balance-Work-Of-Bi-directional-Tunnel-At-Km-83rd-And-A-Major-Bridge-Between-Km-82.675-And-Km-82.925-On-Nh-244-In-The-Ut-Of-Jk-On-Epc-Mode>Nhidcl/jk/nh-244/epc/ Tunnelkm83/2025-26
Construction Of Balance Work Of Bi-directional Tunnel At Km 83rd And A Major Bridge Between Km 82.675 And Km 82.925 On Nh-244 In The Ut Of Jk On Epc Mode
-Construction-Of-Balance-Work-Of-Bi-directional-Tunnel-At-Km-83rd-And-A-Major-Bridge-Between-Km-82.675-And-Km-82.925-On-Nh-244-In-The-Ut-Of-Jk-On-Epc-Mode>2025-09-15
India Estimate For Road Sweeping Of Internal Roads By Mechanical Sweepers With In Mc Limits (3 Years And Extendable For 2 Years) (mc Fund). 2025-09-15
India Set Of Bracket For Lhb Gs .#* Set Of Bracket For Lhb Gs Coaches, As Per Drawing: Mplsmlgs Version 2, Packin g Instruction: No Special Packing Required. The Protruding, Threaded Portion, Gauges And loose Items Etc. If Any Are To Be Protected With Suitable 2025-09-15
Whats app