Filter Search


Asia-Pacific


Location Summary Deadline
-Solar-Light-(street)-At-Different-Places-Under-Part-No-20/166-(28-Nos).-Under-Kumlai-Gp,-Mal-Block,-Jalpaiguri-Fund-Apas(nres)-Apas-Id-apas/01/020/166/0001>India -Solar-Light-(street)-At-Different-Places-Under-Part-No-20/166-(28-Nos).-Under-Kumlai-Gp,-Mal-Block,-Jalpaiguri-Fund-Apas(nres)-Apas-Id-apas/01/020/166/0001>Wb/54/bdo/mal/2025-26/03
Solar Light (street) At Different Places Under Part No 20/166 (28 Nos). Under Kumlai Gp, Mal Block, Jalpaiguri Fund Apas(nres) Apas Id-apas/01/020/166/0001
-Solar-Light-(street)-At-Different-Places-Under-Part-No-20/166-(28-Nos).-Under-Kumlai-Gp,-Mal-Block,-Jalpaiguri-Fund-Apas(nres)-Apas-Id-apas/01/020/166/0001>2025-12-29
India Supply Of (pl) Coupling/running Drive Kit Plassser Part No. 64.02.2000.51stkl Make Plasser[ Warranty Period: 6 Months After The Date Of Delivery ] ] 2025-12-29
India Construction Of Cc Road Haridaspur High School To Football Ground At Booth No-185 Within Sikhira Champta Gp Under Pandua Panchayet Samity 2025-12-29
-Construction-Of-Bridge-I)-Br.-No.-1/1-On-Baliduar-To-Ubhota-Chapori-Road>India -Construction-Of-Bridge-I)-Br.-No.-1/1-On-Baliduar-To-Ubhota-Chapori-Road>Golaghat/15 Construction Of Bridge I) Br. No. 1/1 On Baliduar To Ubhota Chapori Road
Construction Of Bridge I) Br. No. 1/1 On Baliduar To Ubhota Chapori Road
-Construction-Of-Bridge-I)-Br.-No.-1/1-On-Baliduar-To-Ubhota-Chapori-Road>2025-12-29
India Cable Cleat Assly,bhel Drg. No.34393041014v00, Acs 4101/ A019 .#* Cable Cleat Assly,bhel Drg. No.34393041014v00, Acs 4101/ A019 [ Warranty period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po 2025-12-29
India Supply, Installation And Commissioning Of Advanced 64 Channel Eeg System Advanced 64 Channel Eeg System 2025-12-29
-Installation-Of-Street-Light-With-Ms-Tubular-Pole-(-4.5-Mtr.-High-)-From-Sk-Selim-House-To-Bheem-Das-House-In-Ward-No-10-Within-Booth-No-142-Of-176-Uluberia-Purba-A.c.-Under-Apas-2025>India -Installation-Of-Street-Light-With-Ms-Tubular-Pole-(-4.5-Mtr.-High-)-From-Sk-Selim-House-To-Bheem-Das-House-In-Ward-No-10-Within-Booth-No-142-Of-176-Uluberia-Purba-A.c.-Under-Apas-2025>Wbmad/um/514/apas/e-t/2025-26 Sl 06
Installation Of Street Light With Ms Tubular Pole ( 4.5 Mtr. High ) From Sk Selim House To Bheem Das House In Ward No 10 Within Booth No 142 Of 176 Uluberia Purba A.c. Under Apas 2025
-Installation-Of-Street-Light-With-Ms-Tubular-Pole-(-4.5-Mtr.-High-)-From-Sk-Selim-House-To-Bheem-Das-House-In-Ward-No-10-Within-Booth-No-142-Of-176-Uluberia-Purba-A.c.-Under-Apas-2025>2025-12-29
-Construction-Of-Road-Crossing-Drain-Near-One-Star-Club,-Mouza.-Uttar-Darua-Under-Booth-No.-128-,priority-Serial-No.-4,-Ward-No.-I,-Within-Contai-Municipality>India -Construction-Of-Road-Crossing-Drain-Near-One-Star-Club,-Mouza.-Uttar-Darua-Under-Booth-No.-128-,priority-Serial-No.-4,-Ward-No.-I,-Within-Contai-Municipality>Construction Of Road Crossing Drain Near One Star Club
Construction Of Road Crossing Drain Near One Star Club, Mouza. Uttar Darua Under Booth No. 128 ,priority Serial No. 4, Ward No. I, Within Contai Municipality
-Construction-Of-Road-Crossing-Drain-Near-One-Star-Club,-Mouza.-Uttar-Darua-Under-Booth-No.-128-,priority-Serial-No.-4,-Ward-No.-I,-Within-Contai-Municipality>2025-12-29
India Erection Of 33/11kv Substation With Connected 33kv And 11kv Lines At Hasgul (v) In Bichkunda (m) Of Banswada Division Of Operation Circle Kamareddy Under T And D/ Si Scheme On Partial Turnkey Basis 2025-12-29
India Electro-mechanical Works Of 3x40 Mw Sirkari Bhyol Rupsiabagar Hep Including Detailed Design, Engineering, Manufacture, Supply, Erection, Testing, Commissioning And Other Associated Different Works On Epc Turnkey Basis. 2025-12-29
Whats app