Filter Search


Asia-Pacific


Location Summary Deadline
India Auction Sale Of Immovable Property, House. 2024-11-11
India Auction Sale Of Property Land. 2024-11-11
-Set-Of-Connectors-Consists-Of-(1)-Plug-Size-40,35-poles-For-Socket-Contact,-Qty--10-Nos/set-(2)-Receptacles-Size-40,-35-poles-For-Pin-Contact-Qty--10-Nos/set.-As-Per-Clw-Specification-No.-Clw/es/3/012>India -Set-Of-Connectors-Consists-Of-(1)-Plug-Size-40,35-poles-For-Socket-Contact,-Qty--10-Nos/set-(2)-Receptacles-Size-40,-35-poles-For-Pin-Contact-Qty--10-Nos/set.-As-Per-Clw-Specification-No.-Clw/es/3/012>Supply Of Set Of Connectors Consists Of (1) Plug
Set Of Connectors Consists Of (1) Plug Size 40,35-poles For Socket Contact, Qty- 10 Nos/set (2) Receptacles Size 40, 35-poles For Pin Contact Qty- 10 Nos/set. As Per Clw Specification No. Clw/es/3/012
-Set-Of-Connectors-Consists-Of-(1)-Plug-Size-40,35-poles-For-Socket-Contact,-Qty--10-Nos/set-(2)-Receptacles-Size-40,-35-poles-For-Pin-Contact-Qty--10-Nos/set.-As-Per-Clw-Specification-No.-Clw/es/3/012>2024-11-11
Philippines Construction Of Bangko Sentral Ng Pilipinas (bsp) Access Road In New Clark City (ncc) 2024-11-11
Japan Ultrasonic Diagnostic Equipment 1 Set 2024-11-11
-Sinking-Of-04-(four)-Nos.-200-Mm-Dia.-X-16.0-Mtr.-Depth-Vertical-River-Bed-Tube-Well-And-Supplying-And-Laying-Of-150-Mm-Dia-Ms-Collecting-Line-With-Other-Allied-Works-From-Riverbed-T>India -Sinking-Of-04-(four)-Nos.-200-Mm-Dia.-X-16.0-Mtr.-Depth-Vertical-River-Bed-Tube-Well-And-Supplying-And-Laying-Of-150-Mm-Dia-Ms-Collecting-Line-With-Other-Allied-Works-From-Riverbed-T>Niet No - 18 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte.(sl.no-01)
Sinking Of 04 (four) Nos. 200 Mm Dia. X 16.0 Mtr. Depth Vertical River Bed Tube Well And Supplying And Laying Of 150 Mm Dia Ms Collecting Line With Other Allied Works From Riverbed T
-Sinking-Of-04-(four)-Nos.-200-Mm-Dia.-X-16.0-Mtr.-Depth-Vertical-River-Bed-Tube-Well-And-Supplying-And-Laying-Of-150-Mm-Dia-Ms-Collecting-Line-With-Other-Allied-Works-From-Riverbed-T>2024-11-11
Philippines Contruction Of Academic Support Building Phase I (design And Build) (two Stage Bidding) 2024-11-11
Japan Electricity Used At Minamikyoto Hospital (ac Three-phase Three-wire System, Supply Voltage 6, 000 Volts), Planned Power Consumption: 3, 326, 257 Kwh 2024-11-11
-Notice-Inviting-E-tender-For-Supply,-Installation,-Commissioning-Of-Devices,-Equipments,-Instrument,-Machineries,-Tools-Etc.-For-Mechanical-Engineering,-Electrical-Engineering,-Physics,-Chemistry-Laboratories-At-Raghuna>India -Notice-Inviting-E-tender-For-Supply,-Installation,-Commissioning-Of-Devices,-Equipments,-Instrument,-Machineries,-Tools-Etc.-For-Mechanical-Engineering,-Electrical-Engineering,-Physics,-Chemistry-Laboratories-At-Raghuna>Wbtet/dtet/nit01/rag/eqp/2024
Notice Inviting E-tender For Supply, Installation, Commissioning Of Devices, Equipments, Instrument, Machineries, Tools Etc. For Mechanical Engineering, Electrical Engineering, Physics, Chemistry Laboratories At Raghuna
-Notice-Inviting-E-tender-For-Supply,-Installation,-Commissioning-Of-Devices,-Equipments,-Instrument,-Machineries,-Tools-Etc.-For-Mechanical-Engineering,-Electrical-Engineering,-Physics,-Chemistry-Laboratories-At-Raghuna>2024-11-11
-Secondary-Lateral-Damper-For-Fiat-Ir-Bogie.-Drawing-No.-:-Rdso/cg/drg-/21045,-Alt.--2.-Matl.-&-Spec.-:-Rdso/cg-18005,-Rev.--1.-[-Warranty-Period:-72-Months-After-The-Date-Of-Delivery-][quantity-T>India -Secondary-Lateral-Damper-For-Fiat-Ir-Bogie.-Drawing-No.-:-Rdso/cg/drg-/21045,-Alt.--2.-Matl.-&-Spec.-:-Rdso/cg-18005,-Rev.--1.-[-Warranty-Period:-72-Months-After-The-Date-Of-Delivery-][quantity-T>Supply Of Secondary Lateral Damper For Fiat Ir Bogie.
Secondary Lateral Damper For Fiat Ir Bogie. Drawing No. : Rdso/cg/drg /21045, Alt.- 2. Matl. & Spec. : Rdso/cg-18005, Rev.- 1. [ Warranty Period: 72 Months After The Date Of Delivery ][quantity T
-Secondary-Lateral-Damper-For-Fiat-Ir-Bogie.-Drawing-No.-:-Rdso/cg/drg-/21045,-Alt.--2.-Matl.-&-Spec.-:-Rdso/cg-18005,-Rev.--1.-[-Warranty-Period:-72-Months-After-The-Date-Of-Delivery-][quantity-T>2024-11-11
Whats app