Filter Search


Asia-Pacific


Location Summary Deadline
India 1) Replacement Of Mechanically Operated Lifting Barrier (molb) With Electrically operated Lifting Barrier (eolb) At 5 No. Of Level Crossing Gates (traffic) Over Gnt division. 2) Replacement Of Mechanically Operated Lifting Barrier(molb) With electrically 2025-10-06
India Annual Rate Contract Of Isi Marked Sodium Hypochlorite Solution Of Grade-ii Containing 12.5 To 15 Percent Chlorine (as Cl), Percent Mass By Volume, As Per Specification No. 11673 1992 (as Amended Up To Date) 2025-10-06
India Sale Of Property By Hdfc Bank Ltd., Coimbatore V/s. Mr Prakash A 2025-10-06
India Set Of Safety Walls For L2ac .#* Set Of Safety Walls For L2ac, As Per Drawing: Mplswl2ac Version 3, Packing Inst ruction: Individually Packed With Corrugated Paper And Supplied In Jute Bag [ Warranty Pe riod: 30 Months After The Date Of Delivery ] ] 2025-10-06
Philippines Installation Of Canopy For La Paz Commercial Center 2025-10-06
India Ward No. 06 Construction Of Cc Road From Kishan Yadav House To Matan Mohalla 2025-10-06
India Cleaning Of Sewage Lines Manholes And Repairs To Compound Wall Gates Fencing And Connected Works At Mtrdc Alisda Ceptum And Dca Complex Under Age B R I Of Ge R And D West Bangalore 2025-10-06
India Conversion Of 18 Nos Bg Coaches Into Art And Arme Coaches Of Nagpur Division on Turnkey Basis 2025-10-06
India Special Estimate For Refurbishment And Painting Of Old And Rusted Substation Towers, Supporting Structures At 220 Kv S/stn. Ia, Hvpnl, Hisar 2025-10-06
India Chikka Banavara - Hassan Section : Strengthening Of Bank By Providing Standard width And Improving Drainage At Isolated Locations From 3/870 To 79/530 (sl) For A length Of 16.65 Km. Maintenance Period Is 6 Months Or One Monsoon Period whichever Is Later. 2025-10-06
Whats app