Filter Search


Asia-Pacific


Location Summary Deadline
-Blind-Socket-Assembly-For-Lhb-Type-Coaches-Conforming-To-Rdso's-Spec.-No.-Rdso/pe/spec/ac/0177-2013-(rev.---01)-And-As-Per-Rcf-Drg.-No.-Lw-71302.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tole>India -Blind-Socket-Assembly-For-Lhb-Type-Coaches-Conforming-To-Rdso's-Spec.-No.-Rdso/pe/spec/ac/0177-2013-(rev.---01)-And-As-Per-Rcf-Drg.-No.-Lw-71302.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tole>Supply Of Blind Socket Assembly
Blind Socket Assembly For Lhb Type Coaches Conforming To Rdso's Spec. No. Rdso/pe/spec/ac/0177-2013 (rev. - 01) And As Per Rcf Drg. No. Lw 71302. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tole
-Blind-Socket-Assembly-For-Lhb-Type-Coaches-Conforming-To-Rdso's-Spec.-No.-Rdso/pe/spec/ac/0177-2013-(rev.---01)-And-As-Per-Rcf-Drg.-No.-Lw-71302.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tole>2024-11-06
-Articulation-Bearing-(sub-assembly)-For-Schaku-Coupler-Of-Emu-Coaches-To-(i)-M/s-Escorts-Drg.no.-40-sk-1960-(3)-(ii)-M/s-Wsf's-Drg.-No.-40-sk-3021-(4)-(iii)-M/s-Sanrok's>India -Articulation-Bearing-(sub-assembly)-For-Schaku-Coupler-Of-Emu-Coaches-To-(i)-M/s-Escorts-Drg.no.-40-sk-1960-(3)-(ii)-M/s-Wsf's-Drg.-No.-40-sk-3021-(4)-(iii)-M/s-Sanrok's>Supply Of Articulation Bearing (sub-assembly) For Schaku Coupler Of Emu Coaches
Articulation Bearing (sub-assembly) For Schaku Coupler Of Emu Coaches To (i) M/s Escorts Drg.no. 40-sk-1960 (3) (ii) M/s Wsf's Drg. No. 40-sk-3021 (4) (iii) M/s Sanrok's
-Articulation-Bearing-(sub-assembly)-For-Schaku-Coupler-Of-Emu-Coaches-To-(i)-M/s-Escorts-Drg.no.-40-sk-1960-(3)-(ii)-M/s-Wsf's-Drg.-No.-40-sk-3021-(4)-(iii)-M/s-Sanrok's>2024-11-06
-Construction-Of-Temporary-Structures-For-Other-Govt.-Organizations-In-C/with-Gs-Mela-2025-Under-Kakdwip-Sub-division-Of-Alipore-Division,-Phe-Dte.-(at-Sagar-Mela-Ground)>India -Construction-Of-Temporary-Structures-For-Other-Govt.-Organizations-In-C/with-Gs-Mela-2025-Under-Kakdwip-Sub-division-Of-Alipore-Division,-Phe-Dte.-(at-Sagar-Mela-Ground)>Phed/ae/niet-03ksd/2024-25_4
Construction Of Temporary Structures For Other Govt. Organizations In C/with Gs Mela-2025 Under Kakdwip Sub-division Of Alipore Division, Phe Dte. (at Sagar Mela Ground)
-Construction-Of-Temporary-Structures-For-Other-Govt.-Organizations-In-C/with-Gs-Mela-2025-Under-Kakdwip-Sub-division-Of-Alipore-Division,-Phe-Dte.-(at-Sagar-Mela-Ground)>2024-11-06
Japan Purchase Of Personal Computers, Etc. - Quantity Is Based On The Separate Specifications. 2024-11-06
-New-Sinking-Of-2-(two)-Nos-200-Mm-Dia-River-Bed-Vertical-Tubewell-Alongwith-Necessary-110-Mm-Dia-Hdpe-Collecting-Line-From-River-Bed-Tubewell-To-Common-Manifold-Chamber-At-River-Bank-(damodar-River)-At-Bhamuria-W/s-Scheme>India -New-Sinking-Of-2-(two)-Nos-200-Mm-Dia-River-Bed-Vertical-Tubewell-Alongwith-Necessary-110-Mm-Dia-Hdpe-Collecting-Line-From-River-Bed-Tubewell-To-Common-Manifold-Chamber-At-River-Bank-(damodar-River)-At-Bhamuria-W/s-Scheme>Wbphed/09/pd/2024-25/sl.36
New Sinking Of 2 (two) Nos 200 Mm Dia River Bed Vertical Tubewell Alongwith Necessary 110 Mm Dia Hdpe Collecting Line From River Bed Tubewell To Common Manifold Chamber At River Bank (damodar River) At Bhamuria W/s Scheme
-New-Sinking-Of-2-(two)-Nos-200-Mm-Dia-River-Bed-Vertical-Tubewell-Alongwith-Necessary-110-Mm-Dia-Hdpe-Collecting-Line-From-River-Bed-Tubewell-To-Common-Manifold-Chamber-At-River-Bank-(damodar-River)-At-Bhamuria-W/s-Scheme>2024-11-06
India Auction Sale Of Immovable Property, Land And Building, Plot. 2024-11-06
India Auction Sale Of Plot No 149 Me Ajmer Chosla Arai Granite 2024-11-06
-Laying-Distribution-Pipe-Line-And-Providing-Functional-Household-Tap-Connection-(fhtc)-Including-Other-Allied-Work-At-Gap-Portion-Of-Tiyashi-For-Zone-iv-Of-Santuri-Block-Under-Purulia-Pipe-Water-Supply-Scheme-(northern-Sec>India -Laying-Distribution-Pipe-Line-And-Providing-Functional-Household-Tap-Connection-(fhtc)-Including-Other-Allied-Work-At-Gap-Portion-Of-Tiyashi-For-Zone-iv-Of-Santuri-Block-Under-Purulia-Pipe-Water-Supply-Scheme-(northern-Sec>Wbphed/09/pd/2024-25/sl.33
Laying Distribution Pipe Line And Providing Functional Household Tap Connection (fhtc) Including Other Allied Work At Gap Portion Of Tiyashi For Zone-iv Of Santuri Block Under Purulia Pipe Water Supply Scheme (northern Sec
-Laying-Distribution-Pipe-Line-And-Providing-Functional-Household-Tap-Connection-(fhtc)-Including-Other-Allied-Work-At-Gap-Portion-Of-Tiyashi-For-Zone-iv-Of-Santuri-Block-Under-Purulia-Pipe-Water-Supply-Scheme-(northern-Sec>2024-11-06
-3-Phase-Measuring-And-Monitoring-Relay-Rated-Voltage-Looo-V-Ac-For-Net1-Net-2-As-Per-Rdso-Specn.-No.-Rdso/pe/spec/ac/0184-2015-(rev.1)-&-Rdso-Letter-No.el/7.1.108/mssbc,dt.17/09/2021.-Make:-M/s.-Carlo-Gavazzi-Model-No.dp>India -3-Phase-Measuring-And-Monitoring-Relay-Rated-Voltage-Looo-V-Ac-For-Net1-Net-2-As-Per-Rdso-Specn.-No.-Rdso/pe/spec/ac/0184-2015-(rev.1)-&-Rdso-Letter-No.el/7.1.108/mssbc,dt.17/09/2021.-Make:-M/s.-Carlo-Gavazzi-Model-No.dp>Supply Of 3 Phase Measuring.
3 Phase Measuring And Monitoring Relay Rated Voltage Looo V Ac For Net1 Net 2 As Per Rdso Specn. No. Rdso/pe/spec/ac/0184-2015 (rev.1) & Rdso Letter No.el/7.1.108/mssbc,dt.17/09/2021. Make: M/s. Carlo Gavazzi Model No.dp
-3-Phase-Measuring-And-Monitoring-Relay-Rated-Voltage-Looo-V-Ac-For-Net1-Net-2-As-Per-Rdso-Specn.-No.-Rdso/pe/spec/ac/0184-2015-(rev.1)-&-Rdso-Letter-No.el/7.1.108/mssbc,dt.17/09/2021.-Make:-M/s.-Carlo-Gavazzi-Model-No.dp>2024-11-06
India Supply Of Ofloxacin 100 Mg + Metronidazole 200 Mg Per 5 Ml, Atleast 30 Ml Syrup ] 2024-11-06
Whats app