Filter Search


Asia-Pacific


Location Summary Deadline
-Emergency-Piling-Work-Along-With-Sand-Filling-For-Protecting-The-Riverbed-Tubewell-Alongwith-Collecting-Line-Against-Flash-Flood-At-Manbazar-i-W/s-Scheme-Under-Purulia-Division,-Phe-Dte.>India -Emergency-Piling-Work-Along-With-Sand-Filling-For-Protecting-The-Riverbed-Tubewell-Alongwith-Collecting-Line-Against-Flash-Flood-At-Manbazar-i-W/s-Scheme-Under-Purulia-Division,-Phe-Dte.>Wbphed/09/pd/2024-25/sl.19
Emergency Piling Work Along With Sand Filling For Protecting The Riverbed Tubewell Alongwith Collecting Line Against Flash Flood At Manbazar-i W/s Scheme Under Purulia Division, Phe Dte.
-Emergency-Piling-Work-Along-With-Sand-Filling-For-Protecting-The-Riverbed-Tubewell-Alongwith-Collecting-Line-Against-Flash-Flood-At-Manbazar-i-W/s-Scheme-Under-Purulia-Division,-Phe-Dte.>2024-11-06
-Widening-&-Strengthening-Of-Navagam--Bhad--Erda--Nerana-Road-K.m.-0/00-To-21/3>India -Widening-&-Strengthening-Of-Navagam--Bhad--Erda--Nerana-Road-K.m.-0/00-To-21/3>Strengthening Of Kutiyana- Mahiyari- Bagsara Road K.m. 0/00 To 30/800 (providing Cement Concrete Road, Box Culvert, Head Wall, Road Furniture Etc (sh-960) (cirf 2023-24).
Widening & Strengthening Of Navagam- Bhad- Erda- Nerana Road K.m. 0/00 To 21/3
-Widening-&-Strengthening-Of-Navagam--Bhad--Erda--Nerana-Road-K.m.-0/00-To-21/3>2024-11-06
Korea Republic of Detailed Design Service For Improving Safety Facilities At 37 Crossings Including The Bukpyeong Line Buksam Crossing 2024-11-06
India Construction Of Temporary Structures Of Police Staffs (ri Complex) And Temporary Special Latrine In C/with Gs Mela-2025 Under Kakdwip Sub-division Of Alipore Division, Phe Dte. 2024-11-06
-Led-Marker-Light-To-Drg/specn.-No.(-I)-Elrs-/spec-/pr-/-0022-(-Rev.1-,oct-2004)-Except-Page-No.-24-(ii)-Clw/es/sk-1/l-29-Alt-a.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Led-Marker-Light-To-Drg/specn.-No.(-I)-Elrs-/spec-/pr-/-0022-(-Rev.1-,oct-2004)-Except-Page-No.-24-(ii)-Clw/es/sk-1/l-29-Alt-a.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Led Marker Light
Led Marker Light To Drg/specn. No.( I) Elrs /spec /pr / 0022 ( Rev.1 ,oct 2004) Except Page No. 24 (ii) Clw/es/sk-1/l-29 Alt-a. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Led-Marker-Light-To-Drg/specn.-No.(-I)-Elrs-/spec-/pr-/-0022-(-Rev.1-,oct-2004)-Except-Page-No.-24-(ii)-Clw/es/sk-1/l-29-Alt-a.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-11-06
India Auction Sale Of Assets, Flat. 2024-11-06
Japan West Tokyo International Innovation Co-creation Hub Network Construction And Management Services 2024-11-06
-Hand-Spliced-Poly-Prolene-Para-Pro-Rope-With-Plain-Loops-At-Both-Ends-To-Is-5175-1992-Size-28mm-Dia-X-4-Mtrs-Effective-Length-Swl-1.5-Ton,-Breaking-Strength-10.1-Ton-With-Test-Certificate.along-With-Tags(aluminium>India -Hand-Spliced-Poly-Prolene-Para-Pro-Rope-With-Plain-Loops-At-Both-Ends-To-Is-5175-1992-Size-28mm-Dia-X-4-Mtrs-Effective-Length-Swl-1.5-Ton,-Breaking-Strength-10.1-Ton-With-Test-Certificate.along-With-Tags(aluminium>Supply Of Hand Spliced Poly Prolene
Hand Spliced Poly Prolene Para Pro Rope With Plain Loops At Both Ends To Is-5175-1992 Size 28mm Dia X 4 Mtrs Effective Length Swl 1.5 Ton, Breaking Strength 10.1 Ton With Test Certificate.along With Tags(aluminium
-Hand-Spliced-Poly-Prolene-Para-Pro-Rope-With-Plain-Loops-At-Both-Ends-To-Is-5175-1992-Size-28mm-Dia-X-4-Mtrs-Effective-Length-Swl-1.5-Ton,-Breaking-Strength-10.1-Ton-With-Test-Certificate.along-With-Tags(aluminium>2024-11-06
India Auction Sale Of Immovable Property, Land And Building, Plot. 2024-11-06
India Supply Of Gum Sprit Of Turpentine Oil To Is: 533/2007 In 205/210 Ltrs M.s. Barreles To Withstand In Transit And Storage Will Be Considered Provided Transit Risk Is Born By The Firm. The Date Of Supply Of The Material Should Be Within 60 Days From The Date 2024-11-06
Whats app