Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Commercial Tower - I At Thane Railway Station Above Satis (e) On Engineering Procurement And Construction (epc) Mode 2024-11-06
India Sale Of Property, House No-92, P.h.no.-20, Ward No.-07, Vill.- Bedamaou, Teh.-bagali. 2024-11-06
Hong Kong Tender Are Invited For Supply, Delivery And Installation Of Local Smoke Extraction System To The Chinese Medicine Hospital 2024-11-06
Japan Consignment Of Operational Support Of The Certificate Authority Etc, For Tax Exemption Procedure Of Export Goods Selling Place 1 Set 2024-11-06
India Construction Of Pcc Road From Sidpur Dhruba Das House To Simulia Chata Para Under Raibandh Gp Within Neturia Dev Block (article 275 (1) Fund) 2024-11-06
-Set-Of-Rubber-Items-For-Pantograph-Type-Am-12-Comprising-Of-04-Items-16-Nos.-As-Per-Sketch-No.-Bsl/elw/sk.no.4008.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Set-Of-Rubber-Items-For-Pantograph-Type-Am-12-Comprising-Of-04-Items-16-Nos.-As-Per-Sketch-No.-Bsl/elw/sk.no.4008.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Set Of Rubber Items For Pantograph
Set Of Rubber Items For Pantograph Type Am-12 Comprising Of 04 Items 16 Nos. As Per Sketch No. Bsl/elw/sk.no.4008. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Set-Of-Rubber-Items-For-Pantograph-Type-Am-12-Comprising-Of-04-Items-16-Nos.-As-Per-Sketch-No.-Bsl/elw/sk.no.4008.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-11-06
-Construction-Of-Boundary-Wall-Sinking-Of-T/well-At-Manbazar-i,zone-ii-Under-Purulia-W/s-Scheme-Under-Purulia-Sadar-Sub-Division-Under-Purulia-Division,-Phe-Dte.>India -Construction-Of-Boundary-Wall-Sinking-Of-T/well-At-Manbazar-i,zone-ii-Under-Purulia-W/s-Scheme-Under-Purulia-Sadar-Sub-Division-Under-Purulia-Division,-Phe-Dte.>Wbphed/09/pd/2024-25/sl.4
Construction Of Boundary Wall Sinking Of T/well At Manbazar-i,zone-ii Under Purulia W/s Scheme Under Purulia Sadar Sub Division Under Purulia Division, Phe Dte.
-Construction-Of-Boundary-Wall-Sinking-Of-T/well-At-Manbazar-i,zone-ii-Under-Purulia-W/s-Scheme-Under-Purulia-Sadar-Sub-Division-Under-Purulia-Division,-Phe-Dte.>2024-11-06
-Construction-Of-Temporary-Structures-For-Ladies-Police-Barrack-At-Ganga-Sagar-Mela-Grround-In-Connection-With-Gs-Mela-2025-Under-Alipore-Division,-Phe-Dte.>India -Construction-Of-Temporary-Structures-For-Ladies-Police-Barrack-At-Ganga-Sagar-Mela-Grround-In-Connection-With-Gs-Mela-2025-Under-Alipore-Division,-Phe-Dte.>Phed/ae/niet-03ksd/2024-25_13
Construction Of Temporary Structures For Ladies Police Barrack At Ganga Sagar Mela Grround In Connection With Gs Mela-2025 Under Alipore Division, Phe Dte.
-Construction-Of-Temporary-Structures-For-Ladies-Police-Barrack-At-Ganga-Sagar-Mela-Grround-In-Connection-With-Gs-Mela-2025-Under-Alipore-Division,-Phe-Dte.>2024-11-06
India Supply Of 220kv Sf6 Gas Filled, Outdoor, Hermitically Sealed Electromagnetic Type 3-core Potential Transformers Along With Accessories And Dismantling, Retrofitting, Testing & Commissioning For 220kv Switchyard Of Ktps-v Stage Under Psd Funds 2024-11-06
Japan All Electricity Used At The Riken Sendai Site 2024-11-06
Whats app