Filter Search


Asia-Pacific


Location Summary Deadline
Malaysia Tender Are Invited For Design, Supply, Delivery, Testing & Commissioning And Warranty Of One (1) Unit Rail Profile Grinder Machine For Ampang Line (agl) site Visit Tender Briefing (mandatory) Date: 15 October 2024 (tuesday) Time: 10.00 Am tender Documen 2025-01-03
Malaysia Tender Are Invited For Design, Supply, delivery, Testing & commissioning And warranty One (1) unit Of Shunting vehicle With rerailing equipment For kelana Jaya Line tender Document Application Via Email As Stated In Item 6 Below. 16 October 2024 (wedn 2025-01-03
Philippines Procurement Of Replacement And Installation Of Control Panel Of Generator Set 45kva Of Tmo El Nido. 2025-01-03
-Set-Of-Lock-Assembly-Consist-Of-(1)-Cab-Door-As-Per-Clw's-Spec.-No.clw/ms/3/111(alt-6).-Clw's-Drg.-No.-1209-09.133-021-(alt-2),-1209-09.133-022-(alt-2),-1209-09.233-023-(alt-2),-Qty.=2-Rh-&-2-Lh.-(2)-Machine-Room-Door>India -Set-Of-Lock-Assembly-Consist-Of-(1)-Cab-Door-As-Per-Clw's-Spec.-No.clw/ms/3/111(alt-6).-Clw's-Drg.-No.-1209-09.133-021-(alt-2),-1209-09.133-022-(alt-2),-1209-09.233-023-(alt-2),-Qty.=2-Rh-&-2-Lh.-(2)-Machine-Room-Door>Supply Of Set Of Lock Assembly
Set Of Lock Assembly Consist Of-(1) Cab Door As Per Clw's Spec. No.clw/ms/3/111(alt-6). Clw's Drg. No. 1209-09.133-021 (alt-2), 1209-09.133-022 (alt-2), 1209-09.233-023 (alt-2), Qty.=2 Rh & 2 Lh. (2) Machine Room Door
-Set-Of-Lock-Assembly-Consist-Of-(1)-Cab-Door-As-Per-Clw's-Spec.-No.clw/ms/3/111(alt-6).-Clw's-Drg.-No.-1209-09.133-021-(alt-2),-1209-09.133-022-(alt-2),-1209-09.233-023-(alt-2),-Qty.=2-Rh-&-2-Lh.-(2)-Machine-Room-Door>2025-01-03
-Gear-Case-Assly-For-3-Phase-Locos-To-Clw-Drg.no--1209-01-013-014-(alt-7).-[-Warrantyperiod:-30-Months-After-The-Date-Of-Delivery-]-]>India -Gear-Case-Assly-For-3-Phase-Locos-To-Clw-Drg.no--1209-01-013-014-(alt-7).-[-Warrantyperiod:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Pl-29030018-gear Case Assly For Wag-9 Etc.
Gear Case Assly For 3 Phase Locos To Clw Drg.no -1209-01-013-014 (alt-7). [ Warrantyperiod: 30 Months After The Date Of Delivery ] ]
-Gear-Case-Assly-For-3-Phase-Locos-To-Clw-Drg.no--1209-01-013-014-(alt-7).-[-Warrantyperiod:-30-Months-After-The-Date-Of-Delivery-]-]>2025-01-03
Taiwan Province of China 345kv Gangfeng~zhongke, Zhongke~hengshan Underground Transmission Line Civil Engineering & Auxiliary E&m System Design-build Project (third Section 2025-01-04
Taiwan Province of China 345kv Gangfeng~zhongke, Zhongke~hengshan Underground Transmission Line Civil Engineering & Auxiliary E&m System Design-build Project (third Section 2025-01-04
Taiwan Province of China 345kv Gangfeng~zhongke, Zhongke~hengshan Underground Transmission Line Civil Engineering & Auxiliary E&m System Design-build Project (third Section 2025-01-04
Australia Data And Voice Network Technical Design And Support Services 2025-01-04
Taiwan Province of China 345kv Gangfeng~zhongke, Zhongke~hengshan Underground Transmission Line Civil Engineering & Auxiliary E&m System Design-build Project (third Section 2025-01-04
Whats app