Filter Search


Asia-Pacific


Location Summary Deadline
Japan Electricity To Use In The Nagasaki Prison And Other Facilities. 2026-01-29
Japan ? Electricity To Use In The Head Office Of Sendai River Office, ? Electricity To Use In The Sandougawa Drainage Pump Station, ? Electricity To Use In The Yunoo Weir Management Office, ? Electricity To Use In The Masaki Weir Management Office 2026-01-29
India Multifunctional Epoxy Resin L- 2832 .#* Multi Functional Epoxy Resin L-2832. Specn./drg. A-0272 Rdso/2008/el/spec/0078 (rev 0) [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po 2026-01-29
Japan Osaka Bayshore Road West Extension Rokko Island Pe20 Bridge Piers And Other Foundation Work (items Subject To Electronic Bidding) (items Subject To Electronic Contracts) 2026-01-29
Japan ?electric Power To Be Consumed At Courthouse Of Wakayama District Court ; Contracted Demand 255kw (the Maximum Demand Of The Month Or The Highest One In The Preceding 11 Months, Whichever Is Higher) ; Estimated Annual Consumption 559, 000kwh ?electric Pow 2026-01-29
Japan Manufacturing Of Far-infrared Laser System And Detectors Of Poloidal Polarimeter, 1 Set 2026-01-29
Japan Electric Power To Be Consumed At Kagoshima Prefectural Police School, 1 Set (contract Amount Of Electricity ; 370kw, Estimated Annual Electricity Consumption ; 759, 000kwh) 2026-01-29
Japan The Threat-based Penetration Test. 2026-01-29
India Design, Supply, Erection, Testing And Commissioning Of Traction Sub- Station (tss), sectioning Post (sp) And Sub-sectioning And Paralleling Posts (ssps) In 2x25kv At system With Scott-connected Transformers In Bellary (bay) - Guntakal (gtl) section Of Gun 2026-01-29
Japan Operation Of The Sakura Science Club Alumni Secretariat For Jfy 2026 ; 1 Set 2026-01-29
Whats app