Filter Search


Asia-Pacific


Location Summary Deadline
India Auction Sale Of Property[39859] / Auction Date - 20.11.2025 To 29.01.2026 , Bakra Mandi , Rjajr1/1122/008036h , Property Number 113 2026-01-28
Japan Electricity To Use In The Fukuoka Detention House And Kokura Detention House. The Estimated Electricity Is 2,044,000kwh 2026-01-28
Japan Support Services Related To Information Security And Information Infrastructure 1 Set 2026-01-28
India Pressure Switch .#* Pressure Switch Rgeb-2, Rgaf, P1, P2, Pressure Switch For Vcd For Locos And For Db-vc b/sb-vcb Of Schneider Make, Sb-vcb Of Btipl Make For Locos/emus/memus And Pressure Switch For M cp (cg1), Cpa(cg2), Eqpt(eg), Bp(cg), Abg, Parking Br 2026-01-28
Thailand Announcement Of The Contest Of Employment, Upgrade Project, Learning Media Center (new) Big Back Building 2026-01-28
Japan Operation And Maintenance Of Remote Access Environment And Institutional Id Infrastructure For Fy 2025, 1 Set 2026-01-28
India Selection Of Concessionaire For Supplying, Installing Commissioning, Manning, Operating And Maintaining Of Smartparking Solutions For Package-1 1st Avenue To 6th Avenue And 1st Main Road To 17th Main Road Annanagar In Chennai Metropolitan Area On Ppp 2026-01-28
Guam Hagatna Wastewater Treatment Plant Secondary Treatment Feasibility Study, Gwa Project No. 22603 2026-01-28
India Spring Loaded Switch For Compressor Used .#* Spring Loaded Switch For Compressor Used As Blcp Pos No.172- Type -sbm Type-f /tus o/21/22/r20 As Per Clw Spec. No. Clw/es/3/0075/b And Abb Document No. Hbtb 5604 R 2001. [ Wa rranty Period: 30 Months After The 2026-01-28
Japan Outsourcing Services For The Printing, Enclosing, Sealing, And Mailing Of Postcards Used To Notify Customers About Upcoming Automatic Payments And The Results Of Those Payments (success Or Failure) 1unit 2026-01-28
Whats app