Filter Search


Asia-Pacific


Location Summary Deadline
Thailand Contracting For Construction To Expand The Electrical Distribution System Area, Land Expansion Project For Mr. Thawat's Housing Estate (phase 1), San Luang Company, Pa Sak Subdistrict, Mueang District, Lamphun Province Wbs_c-67-a-lpncs.0138.01.1 2024-11-25
Japan Main Room: 15t Ceiling Crane Refurbishment, Complete Set 2024-11-25
India Construction And Maintenance Of Road And Storm Water Drainage System Etc At R K Nagar Industrial Estate Tripura Package 04 2024-11-25
-Locking-Arrangement-For-Emergency-Openable-Window-For-Non-Ac-Coaches-Drawing-No.:--Icf/std-5-4-005,-Alt-.-(-N-)-Items--14,-16,-17,-20,-21,-&-22-As-Per-Col.-I.-And-Items-->India -Locking-Arrangement-For-Emergency-Openable-Window-For-Non-Ac-Coaches-Drawing-No.:--Icf/std-5-4-005,-Alt-.-(-N-)-Items--14,-16,-17,-20,-21,-&-22-As-Per-Col.-I.-And-Items-->Supply Of Locking Arrangement For Emergency Openable Window For Non Ac Coaches
Locking Arrangement For Emergency Openable Window For Non Ac Coaches Drawing No.:- Icf/std-5-4-005, Alt . ( N ) Items -14, 16, 17, 20, 21, & 22 As Per Col. I. And Items -
-Locking-Arrangement-For-Emergency-Openable-Window-For-Non-Ac-Coaches-Drawing-No.:--Icf/std-5-4-005,-Alt-.-(-N-)-Items--14,-16,-17,-20,-21,-&-22-As-Per-Col.-I.-And-Items-->2024-11-25
-Construction-Of-Pump-House-(switch-Room-Cum-Chlorine-Room)-With-Sanitary-And-Water-Supply-Arrangement-(size-5.9-M-X-4.1-M)-For-Augmentation-Of-Nabakishor-Water-Supply-Sch>India -Construction-Of-Pump-House-(switch-Room-Cum-Chlorine-Room)-With-Sanitary-And-Water-Supply-Arrangement-(size-5.9-M-X-4.1-M)-For-Augmentation-Of-Nabakishor-Water-Supply-Sch>Niet No - 22 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte. (2nd Call) (sl.no-08)
Construction Of Pump House (switch Room Cum Chlorine Room) With Sanitary And Water Supply Arrangement (size 5.9 M X 4.1 M) For Augmentation Of Nabakishor Water Supply Sch
-Construction-Of-Pump-House-(switch-Room-Cum-Chlorine-Room)-With-Sanitary-And-Water-Supply-Arrangement-(size-5.9-M-X-4.1-M)-For-Augmentation-Of-Nabakishor-Water-Supply-Sch>2024-11-25
Japan Radio Control Mowing Machine 33 Ea 2024-11-25
-Laying-Rising-Main,-Construction-Of-Boundary-Wall,-Staff-Room-And-Toilet-Of-Augmentation-Of-Kheyarkanali-Ohr-(zone---J)-Under-Bankura---I,-Ii-And-Barjora-Block-W/s-Scheme>India -Laying-Rising-Main,-Construction-Of-Boundary-Wall,-Staff-Room-And-Toilet-Of-Augmentation-Of-Kheyarkanali-Ohr-(zone---J)-Under-Bankura---I,-Ii-And-Barjora-Block-W/s-Scheme>Niet No - 22 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte. (2nd Call) (sl.no-17)
Laying Rising Main, Construction Of Boundary Wall, Staff Room And Toilet Of Augmentation Of Kheyarkanali Ohr (zone - J) Under Bankura - I, Ii And Barjora Block W/s Scheme
-Laying-Rising-Main,-Construction-Of-Boundary-Wall,-Staff-Room-And-Toilet-Of-Augmentation-Of-Kheyarkanali-Ohr-(zone---J)-Under-Bankura---I,-Ii-And-Barjora-Block-W/s-Scheme>2024-11-25
India Civil Works. 2024-11-25
India Construction And Maintenance Of Road And Storm Water Drainage System Etc At R K Nagar Industrial Estate Tripura Package 05 2024-11-25
Japan Facility-cleaning Service For The Hospital 1 Set 2024-11-25
Whats app