Filter Search


Asia-Pacific


Location Summary Deadline
-Design,-Laying,-Testing,-Commissioning-Of-400mm,-600-Mm-I/d-D.i-K-9-Pipe-Line---7.1-(27.7-Km)-From-Proposed-Mbs-At-Dadasiya-And-New-Ranney-Wells-At-Lalpur,-Mahawatpur-And-Amipur,-300-Mm-I/d-D.i-Pipe-(1-Km)-On-Surajkund>India -Design,-Laying,-Testing,-Commissioning-Of-400mm,-600-Mm-I/d-D.i-K-9-Pipe-Line---7.1-(27.7-Km)-From-Proposed-Mbs-At-Dadasiya-And-New-Ranney-Wells-At-Lalpur,-Mahawatpur-And-Amipur,-300-Mm-I/d-D.i-Pipe-(1-Km)-On-Surajkund>Master Water Supply Scheme ...
Design, Laying, Testing, Commissioning Of 400mm, 600 Mm I/d D.i K-9 Pipe Line - 7.1 (27.7 Km) From Proposed Mbs At Dadasiya And New Ranney Wells At Lalpur, Mahawatpur And Amipur, 300 Mm I/d D.i Pipe (1 Km) On Surajkund
-Design,-Laying,-Testing,-Commissioning-Of-400mm,-600-Mm-I/d-D.i-K-9-Pipe-Line---7.1-(27.7-Km)-From-Proposed-Mbs-At-Dadasiya-And-New-Ranney-Wells-At-Lalpur,-Mahawatpur-And-Amipur,-300-Mm-I/d-D.i-Pipe-(1-Km)-On-Surajkund>2026-01-13
-Construction-And-Renovation-Of-Drain-With-Cover-Slab-From-147/1-Naskar-Para-Road-To-187/1-Naskar-Para-Road-Ward-No.-3,under-Hmc-Apas-Fund-Defect-Liability-Period-01-Year.>India -Construction-And-Renovation-Of-Drain-With-Cover-Slab-From-147/1-Naskar-Para-Road-To-187/1-Naskar-Para-Road-Ward-No.-3,under-Hmc-Apas-Fund-Defect-Liability-Period-01-Year.>Wb-hmc/tn/ed/sandd/40/25-26_03
Construction And Renovation Of Drain With Cover Slab From 147/1 Naskar Para Road To 187/1 Naskar Para Road Ward No.-3,under Hmc Apas Fund Defect Liability Period 01 Year.
-Construction-And-Renovation-Of-Drain-With-Cover-Slab-From-147/1-Naskar-Para-Road-To-187/1-Naskar-Para-Road-Ward-No.-3,under-Hmc-Apas-Fund-Defect-Liability-Period-01-Year.>2026-01-13
-Restoration-Of-Road-Disturbed-By-Wbsedcl-Due-To-Laying-Of-Cable-Duct-At-Jamader-Para-From-Pre-No.-24-To-C52-Jamader-Para-In-Ward-No.-111-Under-Br-Xi>India -Restoration-Of-Road-Disturbed-By-Wbsedcl-Due-To-Laying-Of-Cable-Duct-At-Jamader-Para-From-Pre-No.-24-To-C52-Jamader-Para-In-Ward-No.-111-Under-Br-Xi>Kmc/roads/2025-2026/394
Restoration Of Road Disturbed By Wbsedcl Due To Laying Of Cable Duct At Jamader Para From Pre No. 24 To C52 Jamader Para In Ward No. 111 Under Br Xi
-Restoration-Of-Road-Disturbed-By-Wbsedcl-Due-To-Laying-Of-Cable-Duct-At-Jamader-Para-From-Pre-No.-24-To-C52-Jamader-Para-In-Ward-No.-111-Under-Br-Xi>2026-01-13
-Construction-Concrete-Road-From-Government-Road-To-Sambhu-Sing-House-At-Nandapur-Booth-No-242-Jl-No-100-Mouza-Nandapur>India -Construction-Concrete-Road-From-Government-Road-To-Sambhu-Sing-House-At-Nandapur-Booth-No-242-Jl-No-100-Mouza-Nandapur>Pcc Road
Construction Concrete Road From Government Road To Sambhu Sing House At Nandapur Booth No 242 Jl No 100 Mouza Nandapur
-Construction-Concrete-Road-From-Government-Road-To-Sambhu-Sing-House-At-Nandapur-Booth-No-242-Jl-No-100-Mouza-Nandapur>2026-01-13
India Redevelopment Of Hostel Facilities Second Floor For 22 Rooms At New Hostel And capacity Enhancement Of Sti/aii For Mechanical And Electrical Staff Involved In rolling Stock Maintenance. 2026-01-13
India Rate Contract For Supply Of Oncology And Other Medicines 2026-01-13
-Repairing-Of-Chlorination-System-Along-With-Replacement-Of-The-Parts-At-Saltlake-Booster-Pumping-Station-.>India -Repairing-Of-Chlorination-System-Along-With-Replacement-Of-The-Parts-At-Saltlake-Booster-Pumping-Station-.>Kmda/em/ee/ed-vii /nit- 05/2025-26(2nd Call)
Repairing Of Chlorination System Along With Replacement Of The Parts At Saltlake Booster Pumping Station .
-Repairing-Of-Chlorination-System-Along-With-Replacement-Of-The-Parts-At-Saltlake-Booster-Pumping-Station-.>2026-01-13
Russian Federation Supply Of Duct Air Conditioners With A Cooling Capacity Of 25 Kw. For The Needs Of Pjsc Rostelecom 2026-01-13
India Creation Of New Source Of Drinking Water Beside The Riverside At Chacksrikrishana 2026-01-13
India Repair And Maintenance Of Control Room Building At 33/11 Kv S/s Khairjhiti Under O&m Dn. Ahiwara. 2026-01-13
Whats app