Filter Search


Asia-Pacific


Location Summary Deadline
-Camc-Of-Data-Communication-System-(dcs)-At-Ageos-Antarctica>India -Camc-Of-Data-Communication-System-(dcs)-At-Ageos-Antarctica>Camc Of Dcs Antenna At Ageos Antarctica
Camc Of Data Communication System (dcs) At Ageos Antarctica
-Camc-Of-Data-Communication-System-(dcs)-At-Ageos-Antarctica>2026-01-06
Philippines Supply/delivery Of Catering Services Framework Agreement 2026-01-06
-Building-Work>India -Building-Work>Construction Of 60 Men Barrack At Bhamini Gram Panchayat, 2nd Ir Bn., Rayagada
Building Work
-Building-Work>2026-01-06
India Tender Invited For Bargarh Handloom Weaver Frp Sculpture , Gangadhar Meher With Book Sculpture , Farmer Family With Rice Bowl Of Odisha , Plantation Work , Installation , Transportation##quantity: 6## 2026-01-06
-Cc-Road-From-House-Anar-Gazi-To-House-Of-Wajed-Gazi-(apas/01/099/184/0003)>India -Cc-Road-From-House-Anar-Gazi-To-House-Of-Wajed-Gazi-(apas/01/099/184/0003)>Nit No 334/ps/apas Sl No 12
Cc Road From House Anar Gazi To House Of Wajed Gazi (apas/01/099/184/0003)
-Cc-Road-From-House-Anar-Gazi-To-House-Of-Wajed-Gazi-(apas/01/099/184/0003)>2026-01-06
India Felt Ring. .#* Felt Ring For Roller Bearing Arrangement To Icf Drg.no. Emu/m-0-2-009 Alt E/3 F or 700/1400 Hp Demu/dpc. Mat.and Spec As Per Drg [ Warranty Period: 30 Months After The Date O f Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : 2026-01-06
-Restoration-Of-600-Kw-And-743-Rpm-Rated-Ht-Induction-Motor-No.-04-At-Behala-Booster-Pumping-Station>India -Restoration-Of-600-Kw-And-743-Rpm-Rated-Ht-Induction-Motor-No.-04-At-Behala-Booster-Pumping-Station>Kmc/ws/bbps/25-26/16
Restoration Of 600 Kw And 743 Rpm Rated Ht Induction Motor No. 04 At Behala Booster Pumping Station
-Restoration-Of-600-Kw-And-743-Rpm-Rated-Ht-Induction-Motor-No.-04-At-Behala-Booster-Pumping-Station>2026-01-06
India Construction Of Bathing Ghat At Rakhaghutu M.m Bundh 2026-01-06
India Supply Of Trisodium Phosphate Technical Dodecohydrate To Is 573- 1992(reaffirmed 2010). [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs ] 2026-01-06
India Work Of Replacement Of Carbon Steel Pipes Ms Pipes During Coh Of Ccpp 2 At Dgbps. 2026-01-06
Whats app