Filter Search


Asia-Pacific


Location Summary Deadline
-Operation-And-Maintenance-Of-Chakulia-Piped-Water-Supply-Scheme-Including-O-And-M-Of-The-Ie-Plant-(pressure-Type)-Installed-For-The-Scheme-In-Goalpukhur-ii-Block>India -Operation-And-Maintenance-Of-Chakulia-Piped-Water-Supply-Scheme-Including-O-And-M-Of-The-Ie-Plant-(pressure-Type)-Installed-For-The-Scheme-In-Goalpukhur-ii-Block>13 Of Ee/rd/phed Of 2025-2026
Operation And Maintenance Of Chakulia Piped Water Supply Scheme Including O And M Of The Ie Plant (pressure Type) Installed For The Scheme In Goalpukhur-ii Block
-Operation-And-Maintenance-Of-Chakulia-Piped-Water-Supply-Scheme-Including-O-And-M-Of-The-Ie-Plant-(pressure-Type)-Installed-For-The-Scheme-In-Goalpukhur-ii-Block>2026-01-08
-Operation-And-Maintenance-Of-Marnai-Piped-Water-Supply-Schemes-In-Itahar-Block>India -Operation-And-Maintenance-Of-Marnai-Piped-Water-Supply-Schemes-In-Itahar-Block>13 Of Ee/rd/phed Of 2025-2026
Operation And Maintenance Of Marnai Piped Water Supply Schemes In Itahar Block
-Operation-And-Maintenance-Of-Marnai-Piped-Water-Supply-Schemes-In-Itahar-Block>2026-01-08
India Equal Tee .#* Equal Tee To Part No. T10l71 Of Ermeto Or Equivalent As Per Spec: Mdst-108, Rev.-1 For Lhb Coaches. warranty Period : Upto 30 Months From The Date Of Supply As Per Irs Condition. [ Warranty Period: 30 Months After Th e Date Of Delivery ] ] 2026-01-08
India Manufacturing And Supply Of Cms Crossing 60 Kg 1 In 12 To Drg. No.t-4220 .#* Manufacturing And Supply Of Cms Crossing 60 Kg 1 In 12 To Rdso Drg. No. Rdso T-4220 alt-8 As Per Specification T-29-2024 With Latest Alt. And Amendment If Any. [ Warranty Period: 2026-01-08
India 1.construction Of Pcc Road From Serajuddin House Towards Eid Gaha At Mahagram Sansad-100000.00 2.construction Of Pcc Road From Jumma Ghor Towards Afajuddin House At Mahagram Sansad-100000.00 3.construction Of Pcc Road From Ajidur House Toward 2026-01-08
India Installation Of High Mast Light Near Tilakchak Primary School Under Arandi 2 Gp 2026-01-08
India Tender Invited For High End Desktop Computer (q2)##quantity: 110## 2026-01-08
-Sitc-Of-Air-Conditioning-Machines-And-The-Renovation-Of-Electrical-Installation-Work-At-The-Old-Meeting-Hall-Of-Tamralipta-Govt.-Medical-College-And-Hospital,-Purba-Medinipur.-(electrical-Work)>India -Sitc-Of-Air-Conditioning-Machines-And-The-Renovation-Of-Electrical-Installation-Work-At-The-Old-Meeting-Hall-Of-Tamralipta-Govt.-Medical-College-And-Hospital,-Purba-Medinipur.-(electrical-Work)>Wbpwd/sse/swec/niq96/2025-26
Sitc Of Air Conditioning Machines And The Renovation Of Electrical Installation Work At The Old Meeting Hall Of Tamralipta Govt. Medical College And Hospital, Purba Medinipur. (electrical Work)
-Sitc-Of-Air-Conditioning-Machines-And-The-Renovation-Of-Electrical-Installation-Work-At-The-Old-Meeting-Hall-Of-Tamralipta-Govt.-Medical-College-And-Hospital,-Purba-Medinipur.-(electrical-Work)>2026-01-08
India Construction Of Pcc Road From Main Road To Raghunath Das House At Nischindapur. 2026-01-08
-Green-Park-Of-6-No-Jhil-In-Ward-No-15-Under-New-Barrackpore-Municipality-1.-Survey,design,-Drawing,-Estimation-And-Preparation-Of-Comprehensive-Based-Dpr-For-New-Barrackpore-Municipality-Area-Under-Amrut-2.0>India -Green-Park-Of-6-No-Jhil-In-Ward-No-15-Under-New-Barrackpore-Municipality-1.-Survey,design,-Drawing,-Estimation-And-Preparation-Of-Comprehensive-Based-Dpr-For-New-Barrackpore-Municipality-Area-Under-Amrut-2.0>Wbmad/nbm/11/469 Of 2025-26 Sl-1
Green Park Of 6 No Jhil In Ward No-15 Under New Barrackpore Municipality 1. Survey,design, Drawing, Estimation And Preparation Of Comprehensive Based Dpr For New Barrackpore Municipality Area Under Amrut 2.0
-Green-Park-Of-6-No-Jhil-In-Ward-No-15-Under-New-Barrackpore-Municipality-1.-Survey,design,-Drawing,-Estimation-And-Preparation-Of-Comprehensive-Based-Dpr-For-New-Barrackpore-Municipality-Area-Under-Amrut-2.0>2026-01-08
Whats app