Filter Search


Asia-Pacific


Location Summary Deadline
India Rate Contract For Manufacture And Supply Of 10mm Thick Nylon Cord Reinforced grooved Rubber Sole Plate For Tws 60kg 1 In 16, 25t Axle Load To Rdso Drg.no.t- 10070 Alt-nil. .#* Rate Contract For Manufacture And Supply Of 10mm Thick Nylon Cord Reinforced Gr 2026-01-27
India Auction Sale Of Property[39854] / Auction Date - 20.11.2025 To 29.01.2026 , Bakra Mandi , Rjajr1/1122/008026h , Property Number 123 2026-01-27
Russian Federation Filter Well Fs-178-8000-0.1-e-bts-c - 9 P. 2026-01-27
Australia The National Measurement Institute (nmi) Requires Two High Performance Liquid Chromatographs (hplc) With Fraction Collectors In Support Of Analysis Of Drugs In Complex Biological Matrices, Such As Testosterone In Urine. 2026-01-27
-Supply-Laying-Installation-Testing-Of-Underground-Chilled-Water-Pipeline-Works-From-Uc-1-Cap-Towards-Eastern-And-Western-Side-Of-Campus-To-Cover-Nearby-Facilities-Including-Provision-For-Future-Expansion-At-Barc-(v)>India -Supply-Laying-Installation-Testing-Of-Underground-Chilled-Water-Pipeline-Works-From-Uc-1-Cap-Towards-Eastern-And-Western-Side-Of-Campus-To-Cover-Nearby-Facilities-Including-Provision-For-Future-Expansion-At-Barc-(v)>Laying Of Chilled Water Pipeline
Supply Laying Installation Testing Of Underground Chilled Water Pipeline Works From Uc-1 Cap Towards Eastern And Western Side Of Campus To Cover Nearby Facilities Including Provision For Future Expansion At Barc (v)
-Supply-Laying-Installation-Testing-Of-Underground-Chilled-Water-Pipeline-Works-From-Uc-1-Cap-Towards-Eastern-And-Western-Side-Of-Campus-To-Cover-Nearby-Facilities-Including-Provision-For-Future-Expansion-At-Barc-(v)>2026-01-27
Japan ?supplementary Electricity For Non-utility Generator To Be Used In The Chiba Port Aviation Fuel Terminal, Supply Voltage 6.6kv, Contract Electricity 1,850kw, The Estimated Electricity For The Year 6,082mwh, And ?supplementary Electricity For Non-u... 2026-01-27
-Construction-Of-Cc-Road-From-Sahanujjaman-House-To-Sahajan-Sardar-House-At-Uttar-Bena,-Sansad-xvii,-Under-Chandipur-Gp,-L-200ft,-W-9ft,-Th-5-(apas/01/099/45/0001)>India -Construction-Of-Cc-Road-From-Sahanujjaman-House-To-Sahajan-Sardar-House-At-Uttar-Bena,-Sansad-xvii,-Under-Chandipur-Gp,-L-200ft,-W-9ft,-Th-5-(apas/01/099/45/0001)>337/ps/apas Sl 37
Construction Of Cc Road From Sahanujjaman House To Sahajan Sardar House At Uttar Bena, Sansad-xvii, Under Chandipur Gp, L-200ft, W-9ft, Th-5 (apas/01/099/45/0001)
-Construction-Of-Cc-Road-From-Sahanujjaman-House-To-Sahajan-Sardar-House-At-Uttar-Bena,-Sansad-xvii,-Under-Chandipur-Gp,-L-200ft,-W-9ft,-Th-5-(apas/01/099/45/0001)>2026-01-27
India Construction Of Iss At Degaon Across River Mahanadi In Sambalpur District Odisha On Epc Turnkey Basis Including Power Connectivity System And Operation And Maintenance For Five Years 2026-01-27
India Fire Retardant Rubber .#* Fire Retardant Rubber Profile As Per Drg. No. Ld 56150 Alt Nil. With Mcf Specification Mmdt s 20047 Rev. Nil [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , T 2026-01-27
-Construction-Of-Cc-Road-From-H/o-Younus-Mondal-To-H/o-Manirul-Mondal-At-Dauki-Under-Chandipur,-Booth-No-36,-Under-Chandipur-Gp-L150-Ft,-W-8ft-(apas/01/099/36/0004)>India -Construction-Of-Cc-Road-From-H/o-Younus-Mondal-To-H/o-Manirul-Mondal-At-Dauki-Under-Chandipur,-Booth-No-36,-Under-Chandipur-Gp-L150-Ft,-W-8ft-(apas/01/099/36/0004)>337/ps/apas Sl 26
Construction Of Cc Road From H/o Younus Mondal To H/o Manirul Mondal At Dauki Under Chandipur, Booth No-36, Under Chandipur Gp L150 Ft, W-8ft (apas/01/099/36/0004)
-Construction-Of-Cc-Road-From-H/o-Younus-Mondal-To-H/o-Manirul-Mondal-At-Dauki-Under-Chandipur,-Booth-No-36,-Under-Chandipur-Gp-L150-Ft,-W-8ft-(apas/01/099/36/0004)>2026-01-27
Whats app