Filter Search


Asia-Pacific


Location Summary Deadline
-Sheet-Pilling-To-Support-The-Pipeline-Alignment-And-Restoration-Of-Pipeline-Alongside-The-Posnd-Located-At-Panchpota-Village-Under-Gobindapur-Zone-i-Ground-Water-Based-Pwss-Under-Santipur-Block-Under-Nadia-Arsenic-Division-i,>India -Sheet-Pilling-To-Support-The-Pipeline-Alignment-And-Restoration-Of-Pipeline-Alongside-The-Posnd-Located-At-Panchpota-Village-Under-Gobindapur-Zone-i-Ground-Water-Based-Pwss-Under-Santipur-Block-Under-Nadia-Arsenic-Division-i,>Wbphe_13_nad_i_25_26_3
Sheet Pilling To Support The Pipeline Alignment And Restoration Of Pipeline Alongside The Posnd Located At Panchpota Village Under Gobindapur Zone-i Ground Water Based Pwss Under Santipur Block Under Nadia Arsenic Division-i,
-Sheet-Pilling-To-Support-The-Pipeline-Alignment-And-Restoration-Of-Pipeline-Alongside-The-Posnd-Located-At-Panchpota-Village-Under-Gobindapur-Zone-i-Ground-Water-Based-Pwss-Under-Santipur-Block-Under-Nadia-Arsenic-Division-i,>2026-01-09
-Construction-Of-Cement-Concrete-Road-Work-(rmc-M30)-From-1no-To-49,-P.-K.-Roy-Chowdhury-Lane-Opposite-Gkw-Main-Gate,-Under-H.m.c.-Ward-No.---39-Length-371.0m,-Width-3.30m-(avg)>India -Construction-Of-Cement-Concrete-Road-Work-(rmc-M30)-From-1no-To-49,-P.-K.-Roy-Chowdhury-Lane-Opposite-Gkw-Main-Gate,-Under-H.m.c.-Ward-No.---39-Length-371.0m,-Width-3.30m-(avg)>Wb-hmc/nit/09/ee-ii/beup/25-26
Construction Of Cement Concrete Road Work (rmc M30) From 1no To 49, P. K. Roy Chowdhury Lane Opposite Gkw Main Gate, Under H.m.c. Ward No. - 39 Length-371.0m, Width-3.30m (avg)
-Construction-Of-Cement-Concrete-Road-Work-(rmc-M30)-From-1no-To-49,-P.-K.-Roy-Chowdhury-Lane-Opposite-Gkw-Main-Gate,-Under-H.m.c.-Ward-No.---39-Length-371.0m,-Width-3.30m-(avg)>2026-01-09
India Worm Drive Hose Clamp .#* Worm Drive Hose Clamp Specification:- Is:4762/2002 (reaffirmed-2021) Size-30 Mm electroplating Coating Of Cadmium Or Zinc On Iron And Steel [ Warranty Period: 30 Months After The date Of Delivery ] [quantity Tolerance (+/-): 5 %a 2026-01-09
Taiwan Province of China Pyrolysis-gc/ms For Polymer Fire Residue Analysis 2026-01-09
India Vnp/aarogya/dog/1, Control Of Stray Dogs Within The Vadgaon Nagar Panchayat Limits 2026-01-09
India Tender Invited For Goods Transport Services - Per Mt - Food Grains, Rtc For Birmanaa To Barmer; Type Of Truck As Per Rtc Mtf; Size Weight Of Vehicle As Per Rtc Mtf##quantity: 2650## 2026-01-09
India Construction Of Cc Road And Rcc Drain From Lakhipur Road To Rajpal House In Ward 11 Shahid Uddham Singh Nagar Raipur Nagar Panchayat Khaga Fatehpur 2026-01-09
India Cc Road From Gp Road To Ho Jaydeb Malik Of At Booth No 87 Under Keshabchak Gp. 2026-01-09
-Repairing-And-Overhauling-Of-Centrifugal-Pump-Set-No-02-(22-Kw/30-Hp)-And-Other-Allied-Works-At-Churulia-High-Lift-Pump-House-Under-Madantore-Water-Supply-Scheme.>India -Repairing-And-Overhauling-Of-Centrifugal-Pump-Set-No-02-(22-Kw/30-Hp)-And-Other-Allied-Works-At-Churulia-High-Lift-Pump-House-Under-Madantore-Water-Supply-Scheme.>Wbphed/ee/amd/ Niet-35 Of 2025-2026/4
Repairing And Overhauling Of Centrifugal Pump Set No-02 (22 Kw/30 Hp) And Other Allied Works At Churulia High Lift Pump House Under Madantore Water Supply Scheme.
-Repairing-And-Overhauling-Of-Centrifugal-Pump-Set-No-02-(22-Kw/30-Hp)-And-Other-Allied-Works-At-Churulia-High-Lift-Pump-House-Under-Madantore-Water-Supply-Scheme.>2026-01-09
-Construction-Of-Cultural-Stage-With-Shade-Kalyani-Firm-More-Para,-In-Part-No-197,-Of-Ward-No--06,-Under-Kalyani-Municipality>India -Construction-Of-Cultural-Stage-With-Shade-Kalyani-Firm-More-Para,-In-Part-No-197,-Of-Ward-No--06,-Under-Kalyani-Municipality>Klym/apas/t-7/2025-2026/sl No-9
Construction Of Cultural Stage With Shade Kalyani Firm More Para, In Part No-197, Of Ward No- 06, Under Kalyani Municipality
-Construction-Of-Cultural-Stage-With-Shade-Kalyani-Firm-More-Para,-In-Part-No-197,-Of-Ward-No--06,-Under-Kalyani-Municipality>2026-01-09
Whats app