Filter Search


Asia-Pacific


Location Summary Deadline
Taiwan Province of China 114 Annual Power Distribution And Pipeline Engineering Project Of Fengshan Branch 2025-09-30
India Door To Door Garbage Collection Work To Be Carried Out By The Municipal Council Rae Bareli. The Tender Is Invited From The Concerned Organization/person/firm From 28/08/2025 To 10/09/2025 Until 05:00 Pm. The Uploaded Tender Will Be Opened On 10/09/2025 At 2025-09-30
India Tolling Operation Maintenance And Transfer Of Asanpur- Forbesganj- Purnea Section Of Nh-27 In The State Of Bihar (tot Bundle-21) 2025-09-30
-Widening-From-Two-Lane-To-Four-Lane-And-Strengthening-At-Km-71/6---73/6,-75/0---78/0-Only-Widening-At-Km-73/6---75/0-Of-Tirchy--Pudukkottai---Aranthangi---Mimisa>India -Widening-From-Two-Lane-To-Four-Lane-And-Strengthening-At-Km-71/6---73/6,-75/0---78/0-Only-Widening-At-Km-73/6---75/0-Of-Tirchy--Pudukkottai---Aranthangi---Mimisa>Widening From Tl To Fl And Strengthening Incl Sub Works In Aranthagi Subdivision Try-47
Widening From Two Lane To Four Lane And Strengthening At Km 71/6 - 73/6, 75/0 - 78/0 Only Widening At Km 73/6 - 75/0 Of Tirchy- Pudukkottai - Aranthangi - Mimisa
-Widening-From-Two-Lane-To-Four-Lane-And-Strengthening-At-Km-71/6---73/6,-75/0---78/0-Only-Widening-At-Km-73/6---75/0-Of-Tirchy--Pudukkottai---Aranthangi---Mimisa>2025-09-30
India Construction Of Additional Pump House With Intake Structure At Anadinni Along With Laying Of Ms Pipe Line From Proposed Additional Pump House To Already Laid Raising Main Of Wtp For Water Supply Scheme To Navanagar Bagalkot On Turnkey Basis 2025-09-30
-Widening-From-Two-Lane-To-Four-Lane-And-Strengthening-At-Km-3/8-5/6,-6/4-7/2-Of-Hosur---Denkanikottai-(via)-Thalli-Road-Including-Cd-Works-At-Km-4/6,-4/8-And-Construction-Of-Drain>India -Widening-From-Two-Lane-To-Four-Lane-And-Strengthening-At-Km-3/8-5/6,-6/4-7/2-Of-Hosur---Denkanikottai-(via)-Thalli-Road-Including-Cd-Works-At-Km-4/6,-4/8-And-Construction-Of-Drain>9_hosur - Denkanikottai (via) Thalli Road
Widening From Two Lane To Four Lane And Strengthening At Km 3/8-5/6, 6/4-7/2 Of Hosur - Denkanikottai (via) Thalli Road Including Cd Works At Km 4/6, 4/8 And Construction Of Drain
-Widening-From-Two-Lane-To-Four-Lane-And-Strengthening-At-Km-3/8-5/6,-6/4-7/2-Of-Hosur---Denkanikottai-(via)-Thalli-Road-Including-Cd-Works-At-Km-4/6,-4/8-And-Construction-Of-Drain>2025-09-30
India Construction Of Bt Work At Sonu Fast Food And Vaishy Gali And Vaishy Gali To Reshu Thakur Maharani Laxmi Bai Ward No.26,katni 2025-09-30
India High Capacity Side Buffer Assembly .#* High Capacity Side Buffer Assembly As Per Rdso Drg. No. Skdl-4561 Alt 1, And As Per Rdso Sp ec No Mp 0.041.00.03 (rev 01) August 2005 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-30
India Raising Of Parapet Wall And Strengthening Of Approaches Of Bridge, Providing inspection Steps At Bridges In The Section Of Aden/rok Under Den-iv. 2025-09-30
India Procurement Of Spares For Rafale Aircraft 2025-09-30
Whats app