Filter Search


Asia-Pacific


Location Summary Deadline
India Special Repair To Bldg No P-15/3 (jco Md Accn) Of Old Imh Complex Under Ge(a) Kolkata 2025-09-18
India Electrical Trd Works In Connection With Provision Of Different Types Of Bonds against The Work "yard Improvement - New Baneswar, New Alipurduar, Samuktala, srirampur Assam And Gosaigaon Hat Yard." 2025-09-18
India Construction Of Walling/fencing Around Panchayat Ghar C Pajan 2025-09-18
India Paryatn Mantralya Bharat Sarkar Ki Sawdesh Darshan 2 Yojna Ke Antargat Cbdd Hetu Shree Kainchi Dham Parisar Ke Vikash Karya Ke Antargat Meditation Hall And Facilitation Center Mai Fire Fighting Ka Sitc Work 2025-09-18
-Widening-From-Intermediate-Lane-To-Two-Lane-And-Strengthening-At-Km-4/0-5/4-Of-Kombadipatty-Road-Including-Reconstruction-Of-Pipe-Culvert-At-Km-4/2-(slm-13)>India -Widening-From-Intermediate-Lane-To-Two-Lane-And-Strengthening-At-Km-4/0-5/4-Of-Kombadipatty-Road-Including-Reconstruction-Of-Pipe-Culvert-At-Km-4/2-(slm-13)>Salem (h) Candm Sub Division (slm-13)
Widening From Intermediate Lane To Two Lane And Strengthening At Km 4/0-5/4 Of Kombadipatty Road Including Reconstruction Of Pipe Culvert At Km 4/2 (slm-13)
-Widening-From-Intermediate-Lane-To-Two-Lane-And-Strengthening-At-Km-4/0-5/4-Of-Kombadipatty-Road-Including-Reconstruction-Of-Pipe-Culvert-At-Km-4/2-(slm-13)>2025-09-18
-One-Time-Improvement-Of-The-Bypassed-Section-Of-Biswanath-Chariali-Town-Portion-From-Ch-201.100-To-Ch-206.200-Of-Nh-15-On-Item-Rate-Basis-In-The-State-Of-Assam-In-Fy-25-26>India -One-Time-Improvement-Of-The-Bypassed-Section-Of-Biswanath-Chariali-Town-Portion-From-Ch-201.100-To-Ch-206.200-Of-Nh-15-On-Item-Rate-Basis-In-The-State-Of-Assam-In-Fy-25-26>As/nh-15/tez/oti/bct/25-26/1
One Time Improvement Of The Bypassed Section Of Biswanath Chariali Town Portion From Ch 201.100 To Ch 206.200 Of Nh-15 On Item Rate Basis In The State Of Assam In Fy-25-26
-One-Time-Improvement-Of-The-Bypassed-Section-Of-Biswanath-Chariali-Town-Portion-From-Ch-201.100-To-Ch-206.200-Of-Nh-15-On-Item-Rate-Basis-In-The-State-Of-Assam-In-Fy-25-26>2025-09-18
India Construction Of Cc Drain, Culvert, Ugd Pipeline, Waters Supply Pipeline And Improvement Of Road In Hundibeedi At Hinakal In Hootagalli Cmc Limit 2025-09-18
India Primary Bump Stop For Fiat Ir Bogie .#* Primary Bump Stop For Fiat Ir Bogie To Rcfs Drg. No. Lw01102 Alt.no.-d And Technical S pecn. No. 17.531 100 03 And Technical Specn. No. 17.617 100 02 And Mdts-148 Rev-01, Mdts-122 Rev 03. [ Warranty Period: 30 Month 2025-09-18
India Special Repair To Roof Treatment Plastering And Misc Works At Kendriya Vidyalaya No 1 In Af Stn Kalaikunda Under Ge Af Kalaikunda 2025-09-18
India Electrification Of Village- Korsaguda Block- Usoor Const- Bijapur Under Awapalli D/c. In (o&m) Dn. Bijapur Distt- Bijapur 2025-09-18
Whats app